New River — Power plant · Biomass · Ingenco Renewable Development, LLCHecate Energy Pulaski 1 — Filed · Solar · VA · 150 MW · 4.9 km away
  • Wind & solar
  • Bioenergy
  • In development
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Biomass

Key facts

Power plant · Biomassran 25% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
11,639 MWh
Grid
25 kV to Appalachian Power Co (PJM)
Location
Pulaski County, Virginia
Operated by
Ingenco Renewable Development, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2014 to 2025
Fuel burned MMBtu by year, 2014 to 2025
  • Oil
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
13 years since 2013
Heat rate
11,346 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
25
Transmission owner
Appalachian Power Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 2025132,056
Capacity factor, 20250.246
Heat rate (Btu/kWh), 202511,346
Net generation (MWh), 202511,639
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Hecate Energy Pulaski 1 Filed Solar 4.9 km 150

Sources EIA-860M