Power plant · Biomass
Key facts
Power plant · Biomassran 25% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2013
- Net generation, 2025
- 11,639 MWh
- Grid
- 25 kV to Appalachian Power Co (PJM)
- Location
- Pulaski County, Virginia
- Operated by
- Ingenco Renewable Development, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 11,639
MWh - Fuel burned, 2025
- 132,056
MMBtu - Capacity factor, 2025
- 24.6
% - Heat rate, 2025
- 11,346
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 11,639 | 132,056 | 24.6% | 11,346 |
| 2024 | 12,656 | 137,886 | 26.7% | 10,895 |
| 2023 | 13,702 | 180,511 | 29.0% | 13,174 |
| 2022 | 17,268 | 188,734 | 36.5% | 10,930 |
| 2021 | 17,665 | 203,890 | 37.3% | 11,542 |
| 2020 | 19,600 | 228,366 | 41.3% | 11,651 |
| 2019 | 19,445 | 210,579 | 41.1% | 10,830 |
| 2018 | 20,972 | 209,099 | 44.3% | 9,970 |
| 2017 | 18,815 | 200,842 | 39.8% | 10,675 |
| 2016 | 19,242 | 204,726 | 40.6% | 10,640 |
| 2015 | 16,888 | 182,153 | 35.7% | 10,786 |
| 2014 | 0 | 0 | — | — |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.