Nichols Canyon 138 kV line — Transmission lineFoothill Solar Project — Postponed · Solar · CA · 1.1 MW · 6.8 mi awayLATTC South Campus Solar — Postponed · Solar · CA · 1.1 MW · 7.2 mi awayAB Van Nuys — Announced · Solar · CA · 1.6 MW · 7.4 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 7.7 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 10.3 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 10.4 mi awayVan Norman Bypass Solar Project — Postponed · Solar · CA · 2 MW · 10.5 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 11.5 mi away20525 Nordhoff PV (North) — Under construction · Solar · CA · 1.9 MW · 13.3 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 13.5 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Nichols Canyon 138 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
138 kV
States crossed
US-CA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
7
Substations at the ends (as the source names them)
Nichols Canyon
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID309896
Voltage class100-161 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Foothill Solar Project Postponed Solar 6.8 mi 1.1
LATTC South Campus Solar Postponed Solar 7.2 mi 1.1
AB Van Nuys Announced Solar 7.4 mi 1.6
Scholl Canyon Under construction Biomass 7.7 mi 12
PRIME DATA CENTER VERNON Built Large load 10.3 mi
Glenarm BESS Plant Filed Storage 10.4 mi 25
Van Norman Bypass Solar Project Postponed Solar 10.5 mi 2
California Institute of Technology Postponed Gas, combined cycle 11.5 mi 16.5
20525 Nordhoff PV (North) Under construction Solar 13.3 mi 1.9
Scattergood Postponed Gas, combined cycle 13.5 mi 346

Sources EIA-860M · EPA ICIS-NPDES

Sources

Attribution