Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Nichols Canyon 138 kV line: route and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Nichols Canyon 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-CA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 7
- Substations at the ends (as the source names them)
- Nichols Canyon
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 309896 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Foothill Solar Project Postponed | Solar | 6.8 mi | 1.1 |
| LATTC South Campus Solar Postponed | Solar | 7.2 mi | 1.1 |
| AB Van Nuys Announced | Solar | 7.4 mi | 1.6 |
| Scholl Canyon Under construction | Biomass | 7.7 mi | 12 |
| PRIME DATA CENTER VERNON Built | Large load | 10.3 mi | |
| Glenarm BESS Plant Filed | Storage | 10.4 mi | 25 |
| Van Norman Bypass Solar Project Postponed | Solar | 10.5 mi | 2 |
| California Institute of Technology Postponed | Gas, combined cycle | 11.5 mi | 16.5 |
| 20525 Nordhoff PV (North) Under construction | Solar | 13.3 mi | 1.9 |
| Scattergood Postponed | Gas, combined cycle | 13.5 mi | 346 |
Sources EIA-860M · EPA ICIS-NPDES