North City - Landfill Gas Engine North — Power plant · Biomass · City of San Diego - (CA)EnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 4.6 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 5.3 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 6.4 mi awayPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 10.1 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 11.3 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 11.8 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • Bioenergy
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

North City - Landfill Gas Engine North

Power plant · Biomass

Key facts

Power plant · Biomass Out of service
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2013
Net generation, 2025
0 MWh
Grid
4 kV to San Diego Gas & Electric Co (CISO)
Location
San Diego County, California
Operated by
City of San Diego - (CA)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2016 to 2025
Fuel burned MMBtu by year, 2016 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
13 years since 2013
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
4.20
Transmission owner
San Diego Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Eia status
By code
OS
Mw
1.60
Units
1
Standby mw
0
Status rule
majority_mw_out_of_service
In service mw
1.60
Out of service mw
1.60
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EnerSmart Mesa Heights Sub Station Under construction Storage 4.6 mi 3
L3 Harris San Diego Under construction Solar 5.3 mi 1.6
Rancho Penasquitos Under construction Hydro 6.4 mi 4.3
Pomerado Energy Storage, LLC Postponed Storage 10.1 mi 6
Alvarado Hydro Facility Postponed Hydro 11.3 mi 1.4
EnerSmart Murray BESS Postponed Storage 11.8 mi 21