Show on map
North Loop — Power plant · Gas, combustion turbine · Tucson Electric Power Co
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, combustion turbine

Key facts

Power plant · Gas, combustion turbineran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1972
Net generation, 2025
1,000 MWh
Grid
46 kV to Tucson Electric Power Co (TEPC)
Location
Pima County, Arizona
Operated by
Tucson Electric Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, combustion turbine source: “Natural Gas Fired Combustion Turbine”
Age
54 years since 1972
Unused energy
943 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
26,359 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
46
Transmission owner
Tucson Electric Power Co
Balancing authority code
TEPC
Balancing authority name
Tucson Electric Power Company
Fuel burned (MMBtu), 202526,359
Capacity factor, 20250.001
Heat rate (Btu/kWh), 202526,359
Net generation (MWh), 20251,000
Balancing authority codeTEPC

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source