North Loop
Power plant · Gas, combustion turbine
Key facts
Power plant · Gas, combustion turbineran 0% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1972
- Net generation, 2025
- 1,000 MWh
- Grid
- 46 kV to Tucson Electric Power Co (TEPC)
- Location
- Pima County, Arizona
- Operated by
- Tucson Electric Power CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 1,000
MWh - Fuel burned, 2025
- 26,359
MMBtu - Capacity factor, 2025
- 0.1
% - Heat rate, 2025
- 26,359
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 1,000 | 26,359 | 0.1% | 26,359 |
| 2024 | 2,456 | 49,856 | 0.3% | 20,300 |
| 2023 | 3,648 | 79,413 | 0.4% | 21,769 |
| 2022 | 21,842 | 328,565 | 2.3% | 15,043 |
| 2021 | 1,689 | 23,452 | 0.2% | 13,885 |
| 2020 | 874 | 16,996 | 0.1% | 19,446 |
| 2019 | 12,476 | 189,924 | 1.3% | 15,223 |
| 2018 | 7,898 | 124,096 | 0.8% | 15,712 |
| 2017 | 1,365 | 21 | 0.1% | — |
| 2016 | 934 | 13 | 0.1% | — |
| 2015 | 857 | 19,501 | 0.1% | 22,755 |
| 2014 | 1,949 | 30,747 | 0.2% | 15,776 |
| 2013 | 3,987 | 74,193 | 0.4% | 18,609 |
| 2012 | 1,642 | 37,207 | 0.2% | 22,660 |
| 2011 | 2,310 | 51,322 | 0.2% | 22,217 |
| 2010 | 605 | 10,414 | 0.1% | 17,213 |
| 2009 | 113 | 11,223 | 0.0% | — |
| 2008 | 3,443 | 61,942 | 0.4% | 17,991 |
| 2007 | 6,488 | 114,516 | 0.7% | 17,650 |
| 2006 | 5,344 | 99,233 | 0.6% | 18,569 |
| 2005 | 7,505 | 120,920 | 0.8% | 16,112 |
| 2004 | 6,992 | 117,718 | 0.7% | 16,836 |
| 2003 (10 of 12 months) | 7,413 | 124,254 | — | 16,762 |
| 2002 | 26,765 | 377,006 | 2.8% | 14,086 |
| 2001 | 73,148 | 1,200,187 | 7.8% | 16,408 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.
Sources
2 sourcesSources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)