Show on map
Norther Tier Landfill — Power plant · Biomass · NextEra Renewable Fuels, LLCBradford Solar PA — Filed · Solar · PA · 100.5 MW · 6.1 mi awayMilan — Postponed · Gas, reciprocating engine · PA · 22 MW · 8.3 mi awayHollenback Farm Data Center Buildings — Filed · Large load · PA · 10.4 mi awayAlpaca — Postponed · Gas, reciprocating engine · PA · 22 MW · 12.3 mi away
  • Wind & solar
  • Bioenergy
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Norther Tier Landfill

Power plant · Biomass

Key facts

Power plant · Biomassran 60% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2025
8,451 MWh
Grid
34 kV to Pennsylvania Electric Co (PJM)
Location
Bradford County, Pennsylvania
Operated by
NextEra Renewable Fuels, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2009 to 2025
Fuel burned MMBtu by year, 2009 to 2025
  • Biomass and waste

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Biomass source: “Landfill Gas”
Age
17 years since 2009
Heat rate
11,422 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
RFC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Pennsylvania Electric Co
Balancing authority code
PJM
Balancing authority name
PJM Interconnection, LLC
Fuel burned (MMBtu), 202596,524
Capacity factor, 20250.603
Heat rate (Btu/kWh), 202511,421.6
Net generation (MWh), 20258,451
Balancing authority codePJM

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Bradford Solar PA Filed Solar 6.1 mi 100.5
Milan Postponed Gas, reciprocating engine 8.3 mi 22
Hollenback Farm Data Center Buildings Filed Large load 10.4 mi
Alpaca Postponed Gas, reciprocating engine 12.3 mi 22

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution