Show on map
NUSTAR ENERGY LP, ALBUQUERQUE — Petroleum product terminalCorazon Energy Storage — Under construction · Storage · NM · 150 MW · 4.4 mi awayPRESBYTERIAN HEALTHCARE INFO SYS CTR — Built · Large load · NM · 4.9 mi awayALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER — Built · Large load · NM · 5.9 mi awayOSO GRANDE TECHNOLOGY — Filed · Large load · NM · 6.9 mi awayWESTPOINTE DATA CENTER — Built · Large load · NM · 7.9 mi awayOso Negro — Permitted · Storage · NM · 100 MW · 8.8 mi awayCSC-A — Built · Large load · NM · 11.9 mi awayUSS Meadow Lake Solar — Under construction · Solar · NM · 3 MW · 13.4 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Nustar Energy LP, Albuquerque

Petroleum product terminal

As filed: NUSTAR ENERGY LP, ALBUQUERQUE

Key facts

Petroleum product terminal Operating
Location
New Mexico

Details

Who’s behind it

Owner
Nustar EnergySourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Capacity not stated

All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Attributes
AttributeValue
Padd3
SiteALBUQUERQUE
SurveyEIA-815
Owner, as the source states itNUSTAR ENERGY LP
Source release202109

Sources

2 sources

Sources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)

Sources

Every source and license · Attribution

View at source

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Corazon Energy Storage Under construction Storage 4.4 mi 150
PRESBYTERIAN HEALTHCARE INFO SYS CTR Built Large load 4.9 mi
ALBUQUERQUE PUBLIC SCHOOLS: DATA CENTER Built Large load 5.9 mi
OSO GRANDE TECHNOLOGY Filed Large load 6.9 mi
WESTPOINTE DATA CENTER Built Large load 7.9 mi
Oso Negro Permitted Storage 8.8 mi 100
CSC-A Built Large load 11.9 mi
USS Meadow Lake Solar Under construction Solar 13.4 mi 3

Sources Berkeley Lab · EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES

Sources

  • Berkeley LabOpen license, with credit · retrieved Nov 4, 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-AirOpen license · retrieved Nov 16, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution