Show on map
Oncor 138 kV line (OSM way 468077366) — Transmission line · OncorEQUINIX N STEMMONS FREEWAY DALLAS — Built · Large load · TX · 8.0 mi awayDLR 40 (Garland data centre) — Filed · Large load · TX · 9.7 mi awayNTT TX-4 DATA CENTER — Under construction · Large load · TX · 9.9 mi awayRAGINGWIRE DATA CENTER — Built · Large load · TX · 10.0 mi awaySDC DFW-VII DATA CENTER PHASE 2 — Built · Large load · TX · 10.1 mi awayEXXONMOBIL DALLAS DATA CENTER — Built · Large load · TX · 10.2 mi awayDA12 (Dallas data centre) — Under construction · Large load · TX · 10.3 mi awayBANK OF AMERICA - RTX MODULAR DATA CENTER — Built · Large load · TX · 10.5 mi awayEDGECORE DATACENTER - FUJITSU CAMPUS ADDITION — Large load · TX · 10.6 mi awayTX Dallas 7750 Dynasty Drive — Under construction · Solar · TX · 2.3 MW · 11.0 mi awayMalala — Postponed · Storage · TX · 200 MW · 11.4 mi awayFLEXENTIAL DATA CENTER EXPANSION — Built · Large load · TX · 11.9 mi awayALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION — Built · Large load · TX · 12.1 mi awayBoxcar Energy Storage — Under construction · Storage · TX · 150 MW · 13.7 mi awayQTS - DFW 3 - DC1 — Filed · Large load · TX · 14.9 mi awayStream Fir Data Center — Filed · Large load · TX · 14.9 mi awayQTS Data Centers 6 and 7 — Filed · Large load · TX · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Stage not stated
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Oncor 138 kV line (OSM way 468077366)

Transmission line

Key facts

Transmission line Operating
Mapped route length
Mapped route length: sourceOpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts · Open license, with creditmiles
Voltage
138 kV
States crossed
US-TX
Operated by
Oncor

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
5
All 16 attributes from OpenStreetMap power network, US — transmission lines and cables (69 kV and up, or voltage not tagged) and substations, from Geofabrik's US state extracts
Attributes
AttributeValue
Powerline
Cables3
Osm id468077366
RegionUS-TX
Osm typeway
Frequency60
UndergroundNo
Voltage raw138000
Voltages kv138
Scope regionsUS-TX
Voltage class100-161 kV
Extract regionsUS-TX
Voltage unknownNo
Coverage regionsUS-TX
Voltage assumed kvNo
Vertex count source54

Sources

1 source

Sources OpenStreetMap

© OpenStreetMap contributors

Sources

  • OpenStreetMapOpen license, with credit · retrieved Oct 10, 2026© OpenStreetMap contributors. Power lines, cables and substations filtered and reshaped by Inframation from the OpenStreetMap elements in Overture Maps' base/infrastructure theme; this derived database is available under the Open Database License 1.0 as GeoParquet files at https://tiles.inframation.io/grid/osm-power/ (latest.json names the current version's files; licence: https://www.openstreetmap.org/copyright)

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EQUINIX N STEMMONS FREEWAY DALLAS Built Large load 8.0 mi
DLR 40 (Garland data centre) Filed Large load 9.7 mi
NTT TX-4 DATA CENTER Under construction Large load 9.9 mi
RAGINGWIRE DATA CENTER Built Large load 10.0 mi
SDC DFW-VII DATA CENTER PHASE 2 Built Large load 10.1 mi
EXXONMOBIL DALLAS DATA CENTER Built Large load 10.2 mi
DA12 (Dallas data centre) Under construction Large load 10.3 mi
BANK OF AMERICA - RTX MODULAR DATA CENTER Built Large load 10.5 mi
EDGECORE DATACENTER - FUJITSU CAMPUS ADDITION Unknown Large load 10.6 mi
TX Dallas 7750 Dynasty Drive Under construction Solar 11.0 mi 2.3
Malala Postponed Storage 11.4 mi 200
FLEXENTIAL DATA CENTER EXPANSION Built Large load 11.9 mi
ALIGNED DATA CENTER MEMORY TECH PHASE 1 ADDITION Built Large load 12.1 mi
Boxcar Energy Storage Under construction Storage 13.7 mi 150
QTS - DFW 3 - DC1 Filed Large load 14.9 mi
Stream Fir Data Center Filed Large load 14.9 mi
QTS Data Centers 6 and 7 Filed Large load 14.9 mi

Sources EPA ICIS-Air · FAA OE/AAA · EPA ICIS-NPDES · EIA-860M

Sources

Attribution