Show on map
- Wind & solar
- Under construction
- Operating
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Under construction
- Operating
Onondaga County - Oak Orchard WWTP: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Onondaga County - Oak Orchard WWTP
Power plant · Solar
Key facts
Power plant · Solarran 1% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2017
- Net generation, 2025
- 238 MWh
- Grid
- 0.5 kV to Niagara Mohawk Power Corp. (NYIS)
- Location
- Onondaga County, New York
- Operated by
- Tesla Inc.SourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Solar source: “Solar Photovoltaic”
- Age
- 9 years since 2017
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 811 |
| Capacity factor, 2025 | 0.014 |
| Net generation (MWh), 2025 | 238 |
| Balancing authority code | NYIS |
Solar array
Solar array
The array area counts panels and inverters only, not buildings, fences or the whole site.
USGS maps the center of this array 4.5 mi from the point this page maps the plant at.
- Array area (acres)
- 9.2
- AC capacity (MW)
- 2
- DC capacity (MW)
- 2.5
- Mounting
- Single-axis tracking
- Site type
- Greenfield
- Began operating
- 2017
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- USPVDBMap services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Bartell South PV I Under construction | Solar | 2.5 mi | 3 |
| SunEast Clay Solar Project Postponed | Solar | 2.6 mi | 50 |
| Mallory South PV I Under construction | Solar | 6.5 mi | 5 |
| Mallory South PV II Under construction | Solar | 6.5 mi | 5 |
| Cold Springs Under construction | Solar | 7.8 mi | 5 |
| Lysander III PV Under construction | Solar | 13.4 mi | 2.4 |
| West Genesee Under construction | Solar | 14.6 mi | 2.9 |
Sources EIA-860M