- Combustion
- Operating
- 10 · 100 · 1,000 MW
Map
- Combustion
- Operating
Overlook Medical Center: location. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Overlook Medical Center
Power plant · Gas, reciprocating engine
Key facts
Power plant · Gas, reciprocating engineran 28% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2012
- Net generation, 2025
- 11,428 MWh
- Grid
- 335 kV to Jersey Central Power & Lt Co (PJM)
- Location
- Union County, New Jersey
- Operated by
- Atlantic Health SystemSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Operations
- Net generation, 2025
- 11,428
MWh - Fuel burned, 2025
- 85,613
MMBtu - Capacity factor, 2025
- 28.4
% - Heat rate, 2025
- 7,492
Btu/kWh
| Year | Net generation (MWh) | Fuel burned (MMBtu) | Capacity factor | Heat rate (Btu/kWh) |
|---|---|---|---|---|
| 2025 | 11,428 | 85,613 | 28.4% | 7,492 |
| 2024 | 0 | 0 | — | — |
| 2023 | 0 | 0 | — | — |
| 2022 | 3,550 | 28,362 | 8.8% | 7,989 |
| 2021 | 6,132 | 55,214 | 15.2% | 9,004 |
| 2020 | 4,912 | 44,785 | 12.2% | 9,118 |
| 2019 | 10,976 | 102,654 | 27.2% | 9,353 |
How these are worked out
Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.