Overlook Medical Center — Power plant · Gas, reciprocating engine · Atlantic Health SystemEASTGREEN INC AIG DATA CENTER — Built · Large load · NJ · 4.3 mi awayCoreweave — Under construction · Large load · NJ · 4.9 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 5.9 mi awayBPL NJ - Union Distribution Center — Under construction · Solar · NJ · 1.5 MW · 6.2 mi awayElizabeth Metropolitan Logistics Center — Under construction · Solar · NJ · 1.2 MW · 8.0 mi awayAB Newark Solar — Postponed · Solar · NJ · 5.6 MW · 8.5 mi awayPrologis - SLNNJ036 - Community Solar — Under construction · Solar · NJ · 1.6 MW · 10.5 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 11.1 mi awayRAR DEVELOPMENT ASSOCIATES — Built · Large load · NJ · 11.2 mi awayElevate Arthur Kill — Under construction · Storage · NY · 15.1 MW · 11.7 mi awaySwiftsure — Postponed · Storage · NY · 121 MW · 11.9 mi awayBARCLAYS CAPITAL DATA CENTER — Built · Large load · NJ · 12.1 mi awayEVOQUE DATA CENTER SOLUTIONS - PNJ1 — Built · Large load · NJ · 12.2 mi awayPrologis - SLCNJ001 - Community Solar — Under construction · Solar · NJ · 3.2 MW · 12.3 mi awayNJ 1 DATA CENTER — Built · Large load · NJ · 12.8 mi awayDLR Totowa Building A (Totowa data centre) — Filed · Large load · NJ · 13.9 mi awayNJ TRANSITGRID — Postponed · Gas, combustion turbine · NJ · 136.1 MW · 14.0 mi awayCLIFTON DATA CENTER — Built · Large load · NJ · 14.1 mi awayBayonne Energy Center — Under construction · Storage · NJ · 49.8 MW · 14.4 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Overlook Medical Center

Power plant · Gas, reciprocating engine

Key facts

Power plant · Gas, reciprocating engineran 28% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
11,428 MWh
Grid
335 kV to Jersey Central Power & Lt Co (PJM)
Location
Union County, New Jersey
Operated by
Atlantic Health SystemSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2019 to 2025
Fuel burned MMBtu by year, 2019 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, reciprocating engine source: “Natural Gas Internal Combustion Engine”
Age
14 years since 2012
Unused energy
29 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
7,492 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Eia status
By code
OP
Mw
2.60
Units
1
SB
Mw
2
Units
1
Standby mw
2
Status rule
some_units_retired
In service mw
4.60
Out of service mw
0
Fuel burned (MMBtu), 202585,613
Capacity factor, 20250.284
Heat rate (Btu/kWh), 20257,491.5
Net generation (MWh), 202511,428
Balancing authority codePJM

Retirement

EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.
Capacity retired
2 MW
Generators retired
2
Capacity still in service
4.6 MW
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
CHPS1Natural Gas Internal Combustion Engine1 MWRetiredOctober 2021
CHPS2Natural Gas Internal Combustion Engine1 MWRetiredSeptember 2022

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
335 kV
Transmission or distribution system owner
Jersey Central Power & Lt Co
Balancing authority
PJM Interconnection, LLC
NERC region
RFC
Transmission lines within 15 mi (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit CHPS2 scheduled to retire, 1 MW · EIA-860M
  • Stated Unit CHPS1 scheduled to retire, 1 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
EASTGREEN INC AIG DATA CENTER Built Large load 4.3 mi
Coreweave Under construction Large load 4.9 mi
BARCLAYS CAPITAL DATA CENTER Built Large load 5.9 mi
BPL NJ - Union Distribution Center Under construction Solar 6.2 mi 1.5
Elizabeth Metropolitan Logistics Center Under construction Solar 8.0 mi 1.2
AB Newark Solar Postponed Solar 8.5 mi 5.6
Prologis - SLNNJ036 - Community Solar Under construction Solar 10.5 mi 1.6
RAR DEVELOPMENT ASSOCIATES × 2 units Built Large load 11.1 mi
Elevate Arthur Kill Under construction Storage 11.7 mi 15.1
Swiftsure Postponed Storage 11.9 mi 121
BARCLAYS CAPITAL DATA CENTER Built Large load 12.1 mi
EVOQUE DATA CENTER SOLUTIONS - PNJ1 Built Large load 12.2 mi
Prologis - SLCNJ001 - Community Solar Under construction Solar 12.3 mi 3.2
NJ 1 DATA CENTER Built Large load 12.8 mi
DLR Totowa Building A (Totowa data centre) Filed Large load 13.9 mi
NJ TRANSITGRID Postponed Gas, combustion turbine 14.0 mi 136.1
CLIFTON DATA CENTER Built Large load 14.1 mi
Bayonne Energy Center Under construction Storage 14.4 mi 49.8