Palos Verdes Gas to Energy — Power plant · Biomass · Los Angeles County SanitationTorrance Dis Ctr 2 - SLLAX100 — Under construction · Solar · CA · 1.4 MW · 4.1 mi awaySan Pedro Public Market (SPPM) — Under construction · Solar · CA · 1.2 MW · 5.9 mi awayWatson Cogeneration — Withdrawn · Gas, combined cycle · CA · 94.2 MW · 6.3 mi awayElevate Pier S — Filed · Battery storage · CA · 70 MW · 7.5 mi awayDominguez - SLLAX512 — Under construction · Solar · CA · 1.3 MW · 7.7 mi awaySouth Bay Dis Ctr 12 - SLLAX104 — Under construction · Solar · CA · 1.2 MW · 8.0 mi awaySouth Bay Dis Ctr 6-SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.0 mi awayFordyce - SLLAX680 — Under construction · Solar · CA · 1.3 MW · 8.0 mi awayScattergood — Postponed · Gas, combined cycle · CA · 346 MW · 9.7 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Palos Verdes Gas to Energy

Power plant · Biomass

Key facts

Power plant · Biomassran 17% of 2010 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1988
Net generation, 2010
19,372 MWh
Grid
66 kV to Southern California Edison Co (CISO)
Location
Los Angeles County, California

Output

Net generation MWh by year, 2001 to 2011
Fuel burned MMBtu by year, 2001 to 2011
  • Gas
  • Biomass and waste

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Technology
Biomass source: “Landfill Gas”
Age
38 years since 1988
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2011
Capacity retired
13 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
GEN1Landfill Gas13 MWRetiredOctober 2011

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
66 kV
Transmission or distribution system owner
Southern California Edison Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies3
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Los Angeles County Sanitation Owner 50.0% Dec 31, 2025 EIA-860
Los Angeles County Owner 50.0% Dec 31, 2025 EIA-860
Los Angeles County Sanitation Operator EIA-860M

Timeline

  • Stated Unit GEN1 scheduled to retire, 13 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · LBNL · CAISO · EIA · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Torrance Dis Ctr 2 - SLLAX100 Under construction Solar 4.1 mi 1.4
San Pedro Public Market (SPPM) Under construction Solar 5.9 mi 1.2
Watson Cogeneration Withdrawn Gas, combined cycle 6.3 mi 94.2
Elevate Pier S Filed Battery storage 7.5 mi 70
Dominguez - SLLAX512 Under construction Solar 7.7 mi 1.3
South Bay Dis Ctr 12 - SLLAX104 Under construction Solar 8.0 mi 1.2
South Bay Dis Ctr 6-SLLAX680 Under construction Solar 8.0 mi 1.3
Fordyce - SLLAX680 Under construction Solar 8.0 mi 1.3
Scattergood Postponed Gas, combined cycle 9.7 mi 346

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 29, 2026Source: California ISO