Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Wilmington Station C 138 kV line: route and 16 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Wilmington Station C 138 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 138 kV
- States crossed
- US-CA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 11
- Substations at the ends (as the source names them)
- Wilmington Station C
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 305607 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Watson Cogeneration Withdrawn | Gas, combined cycle | 0.7 mi | 94.2 |
| Dominguez - SLLAX512 Under construction | Solar | 1.7 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 2.0 mi | 1.2 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 2.0 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 2.0 mi | 1.3 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 3.0 mi | 1.4 |
| Elevate Pier S Filed | Storage | 3.0 mi | 70 |
| PRIME DATA CENTER VERNON Built | Large load | 3.9 mi | |
| San Pedro Public Market (SPPM) Under construction | Solar | 4.7 mi | 1.2 |
| LATTC South Campus Solar Postponed | Solar | 5.9 mi | 1.1 |
| Bandini - SLLAX710 Under construction | Solar | 7.3 mi | 1.3 |
| Scattergood Postponed | Gas, combined cycle | 9.4 mi | 346 |
| CPA 3777 Workman Postponed | Solar | 13.3 mi | 1.9 |
| Glenarm BESS Plant Filed | Storage | 13.8 mi | 25 |
| Westminster Reliability Project, LLC Under construction | Storage | 14.3 mi | 110 |
| Scholl Canyon Under construction | Biomass | 14.8 mi | 12 |
Sources EIA-860M · CAISO · EPA ICIS-NPDES