Park 500 Philip Morris USA: location and 18 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Park 500 Philip Morris USA
Power plant · Gas, steam turbine
Key facts
Power plant · Gas, steam turbineran 12% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1983
- Net generation, 2025
- 13,396 MWh
- Grid
- 14 kV to Virginia Electric & Power Co (PJM)
- Location
- Chesterfield County, Virginia
- Operated by
- Philip Morris USA - Park 500
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- Altria Group Inc
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Gas, steam turbine source: “Natural Gas Steam Turbine”
- Age
- 43 years since 1983
- Unused energy
- 100 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
All 5 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 521,027 |
| Capacity factor, 2025 | 0.118 |
| Net generation (MWh), 2025 | 13,396.2 |
| Balancing authority code | PJM |
Data notes (1)
- Heat rate (Btu/kWh), 2025 not shown: computed 38893.7 outside 5000-30000 Btu/kWh
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 6.1 MW
- Generators retired
- 1
- Capacity still in service
- 13 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| TG2 | Conventional Steam Coal | 6.1 MW | Retired | September 2013 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 14 kV
- Transmission or distribution system owner
- Virginia Electric & Power Co
- Balancing authority
- PJM Interconnection, LLC
- NERC region
- SERC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Philip Morris USA - Park 500 | Operator | EIA-860M | ||
| ALTRIA GROUP INC | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
Timeline
- Stated Unit TG2 scheduled to retire, 6.1 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Peanut LLC Filed | Large load | 1.4 mi | |
| CHIRISA RICHMOND LLC Built | Large load | 2.9 mi | |
| 11751 MEADOWVILLE OWNER LLC C/O GFH CAPITAL LTD Built | Large load | 3.3 mi | |
| Chesterfield Filed | Gas, combustion turbine | 6.4 mi | 1,000 |
| Bridleton Solar Filed | Solar | 8.4 mi | 20 |
| Chickahominy Power LLC Postponed | Gas, combined cycle | 9.7 mi | 1,716.3 |
| C4GT Postponed | Gas, combined cycle | 9.7 mi | 1,060 |
| PROJECT TROPICAL PHASE 2 - DATA CENTER AND SUBSTAT Under construction | Large load | 9.9 mi | |
| IRON MOUNTAIN DATA CENTER Under construction | Large load | 10.1 mi | |
| PointOne Richmond LLC Filed | Large load | 10.2 mi | |
| Chester Solar Technology Park, LLC Filed | Solar | 10.3 mi | 160 |
| SCOUT DEVELOPMENT LLC Built | Large load | 10.4 mi | |
| QTS RICHMOND DATA CENTER Built | Large load | 10.7 mi | |
| Petersburg - VA 0224 (Murphy) Under construction | Solar | 10.8 mi | 2.6 |
| Bank of America - Sandston Built | Large load | 10.9 mi | |
| Iron Mountain Information Management LLC Filed | Large load | 11.3 mi | |
| QTS RIC5 Data Center Filed | Large load | 11.9 mi | |
| QTS Richmond V LLC Filed | Large load | 12.0 mi |
Sources Virginia DEQ · EPA ICIS-Air · EIA-860M · EPA ICIS-NPDES · FAA OE/AAA
Sources
- Virginia DEQSource: Virginia Department of Environmental Quality
- EPA ICIS-Air
- EIA-860M
- EPA ICIS-NPDES
- FAA OE/AAA