Patterson Pass — Power plant · Wind · EDF Renewable Asset Holdings, Inc.Mulqueeney Wind Energy — Wind · CA · 80 MW · 2.2 km awaySand Hill A — Wind · CA · 13.5 MW · 4.7 km awayTESLA Power Project — Gas, combined cycle · CA · 1,322 MW · 4.9 km awayRooney Ranch — Wind · CA · 21 MW · 5.2 km awaySand Hill B — Wind · CA · 17 MW · 6.1 km awaySand Hill C — Wind · CA · 80.8 MW · 7.7 km awayTracy BESS — Storage · CA · 40 MW · 11.0 km awayZeus BESS — Storage · CA · 200 MW · 11.1 km awayBuena Vista Energy LLC — Storage · CA · 100 MW · 12.4 km awayTres Vaqueros Wind Farms LLC — Wind · CA · 28.3 MW · 13.6 km awayAramis I Solar Project — Storage · CA · 100 MW · 14.4 km awayAramis I Solar Project — Solar · CA · 100 MW · 14.4 km awayTracy Renewable Power Plant — Biomass · CA · 5 MW · 18.3 km awayNorCal FPV 1 — Solar · CA · 10 MW · 19.0 km awayNorCal FPV 1 (Pond 2) — Solar · CA · 1.8 MW · 19.0 km away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Patterson Pass

Power plant · Wind

Key facts

Power plant · Windran 16% of 2013 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1985
Net generation, 2013
30,604 MWh
Grid
21 kV to Pacific Gas & Electric Co (CISO)
Location
Alameda County, California

Output

Net generation MWh by year, 2004 to 2014

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Wind source: “Onshore Wind Turbine”
Age
41 years since 1985
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000908596
Location id
L100000906331
Eia plant ids
56213
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
October 2014
Capacity retired
21.9 MW
Generators retired
2
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
WND1Onshore Wind Turbine8.1 MWRetiredOctober 2014
WND2Onshore Wind Turbine13.8 MWRetiredOctober 2014

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
21 kV
Transmission or distribution system owner
Pacific Gas & Electric Co
Balancing authority
California Independent System Operator
NERC region
WECC
Transmission lines within 25 km (10)
Connection points within 25 km (4)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

4 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
EDF Renewable Asset Holdings, Inc. Operator EIA-860M
Enxco Windfarm IV Owner 30.0% 31 Dec 2025 EIA-860
Volkar, Coombs Partners Owner 40.0% 31 Dec 2025 EIA-860
Havoco Wind Energy, LLC Owner 30.0% 31 Dec 2025 EIA-860

Timeline

  • Stated Units WND1, WND2 scheduled to retire, 21.9 MW · EIA-860M
  • In service · EIA-860M

Sources

7 sources

Sources EIA-860M · GEM · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Mulqueeney Wind Energy Under construction Wind 2.2 km 80
Sand Hill A Filed Wind 4.7 km 13.5
TESLA Power Project Postponed Gas, combined cycle 4.9 km 1,322
Rooney Ranch Filed Wind 5.2 km 21
Sand Hill B Filed Wind 6.1 km 17
Sand Hill C Contracted Wind 7.7 km 80.8
Tracy BESS Under construction Storage 11.0 km 40
Zeus BESS Contracted Storage 11.1 km 200
Buena Vista Energy LLC Postponed Storage 12.4 km 100
Tres Vaqueros Wind Farms LLC Withdrawn Wind 13.6 km 28.3
Aramis I Solar Project × 2 units Under construction Storage 14.4 km 200
Tracy Renewable Power Plant Under construction Biomass 18.3 km 5
NorCal FPV 1 Under construction Solar 19.0 km 10
NorCal FPV 1 (Pond 2) Under construction Solar 19.0 km 1.8

Sources CAISO · EIA-860M