Perris — Power plant · Hydro · Metropolitan Water District of S CAPerris DC 5 - sline015 — Solar · CA · 1.6 MW · 4.8 km awaySan Jacinto Solar — Solar · CA · 1.5 MW · 4.8 km awayLake Perris Solar — Solar · CA · 1.5 MW · 4.9 km awayAmazon - Moreno Valley — Solar · CA · 2.2 MW · 6.5 km awayTrestles Grid LLC — Storage · CA · 150 MW · 10.6 km awayRCWMD Badlands Landfill Gas Project — Biomass · CA · 1.2 MW · 14.6 km away
  • Clean firm
  • Wind & solar
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Hydro

Key facts

Power plant · Hydro Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1983
Net generation, 2025
0 MWh
Grid
34 kV to Southern California Edison Co (CISO)
Location
Riverside County, California
Operated by
Metropolitan Water District of S CASourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Hydro source: “Conventional Hydroelectric”
Age
43 years since 1983
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
34.50
Transmission owner
Southern California Edison Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 20250
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation 0.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Perris DC 5 - sline015 Under construction Solar 4.8 km 1.6
San Jacinto Solar Postponed Solar 4.8 km 1.5
Lake Perris Solar Postponed Solar 4.9 km 1.5
Amazon - Moreno Valley Postponed Solar 6.5 km 2.2
Trestles Grid LLC Postponed Storage 10.6 km 150
RCWMD Badlands Landfill Gas Project Postponed Biomass 14.6 km 1.2

Sources EIA-860M

Sources

Attribution