Show on map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Combustion
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
PHILLIPS 66 COMPANY - COLTON, COLTON CA: location and 25 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Phillips 66 Company - Colton, Colton CA
Petroleum product terminal
As filed: PHILLIPS 66 COMPANY - COLTON, COLTON CA
Key facts
Petroleum product terminal Operating- Location
- California
Details
Who’s behind it
- Owner
- Phillips 66 Company - ColtonSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 5 |
| Site | COLTON CA |
| Survey | EIA-815 |
| Owner, as the source states it | PHILLIPS 66 COMPANY - COLTON |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CA Bloomington 2551 S Lilac Avenue Micro Under construction | Solar + storage | 0.8 mi | 3 |
| Solar Photovoltaic Project #24 Postponed | Solar | 1.8 mi | 4 |
| Solar Photovoltaic Project #30 Postponed | Solar | 3.4 mi | 1.5 |
| CA Riverside 2356 Fleetwood Dr. Under construction | Solar + storage | 3.6 mi | 4 |
| Solar Photovoltaic Project #25 Postponed | Solar | 5.6 mi | 4.5 |
| Solar Photovoltaic Project #27 Postponed | Solar | 5.7 mi | 1 |
| Solar Photovoltaic Project #28 Postponed | Solar | 5.7 mi | 0.5 |
| SunE Redlands Postponed | Solar | 7.1 mi | 1.5 |
| OES Biogas Power Under construction | Biomass | 7.7 mi | 2.6 |
| Solar Photovoltaic Project #17 Postponed | Solar | 7.9 mi | 0.5 |
| Solar Photovoltaic Project #14 Postponed | Solar | 8.1 mi | 1.5 |
| Solar Photovoltaic Project #10 Postponed | Solar | 8.6 mi | 0.5 |
| Solar Photovoltaic Project #18 Postponed | Solar | 8.7 mi | 0.5 |
| Solar Photovoltaic Project #19 Postponed | Solar | 8.8 mi | 5 |
| Solar Photovoltaic Project #04 Postponed | Solar | 8.8 mi | 1.5 |
| Solar Photovoltaic Project #23 Postponed | Solar | 8.9 mi | 0.5 |
| Redlands DC 9 - sline609 Under construction | Solar + storage | 9.4 mi | 5 |
| Solar Photovoltaic Project #20 Postponed | Solar | 9.5 mi | 3.5 |
| Solar Photovoltaic Project #21 Postponed | Solar | 10.7 mi | 2.5 |
| Solar Photovoltaic Project #12 Postponed | Solar | 11.3 mi | 0.5 |
| Solar Photovoltaic Project #08 Postponed | Solar | 11.5 mi | 0.5 |
| Solar Photovoltaic Project #31 Postponed | Solar | 11.5 mi | 1 |
| Energy Center Announced | Gas, combustion turbine | 11.6 mi | 0.9 |
| Solar Photovoltaic Project #09 Postponed | Solar | 11.8 mi | 0.5 |
| Roadhouse Energy Center Contracted | Storage | 12.3 mi | 300 |