Show on map
Phillips — Power plant · Oil · Tampa Electric CoHighland Solar North — Solar · FL · 149.8 MW · 19.0 km awayHighland Solar South — Solar · FL · 74.9 MW · 20.2 km away
  • Combustion
  • Wind & solar
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oil Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1983
Net generation, 2012
0 MWh
Grid
69 kV to Tampa Electric Co (TEC)
Location
Highlands County, Florida
Operated by
Tampa Electric CoSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2012
Fuel burned MMBtu by year, 2001 to 2012
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
43 years since 1983
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Balancing authority codeTEC

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
November 2015
First unit retired
March 2006
Capacity retired
42 MW
Generators retired
3
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
3Petroleum Liquids3.6 MWRetiredMarch 2006
1Petroleum Liquids19.2 MWRetiredNovember 2015
2Petroleum Liquids19.2 MWRetiredNovember 2015

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
69 kV
Transmission or distribution system owner
Tampa Electric Co
Balancing authority
Tampa Electric Company
NERC region
SERC
Transmission lines within 25 km (2)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Units 1, 2 scheduled to retire, 38.4 MW · EIA-860M
  • Stated Unit 3 scheduled to retire, 3.6 MW · EIA-860M
  • In service · EIA-860M

Sources

4 sources

Sources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Highland Solar North Under construction Solar 19.0 km 149.8
Highland Solar South Under construction Solar 20.2 km 74.9

Sources EIA-860M · Berkeley Lab

Sources

  • EIA-860M Preliminary Monthly Electric Generator InventoryOpen license · retrieved 4 Nov 2026
  • LBNL "Queued Up" project-level interconnection queue data file (non-ISO regions)Open license, with credit · retrieved 4 Nov 2026Lawrence Berkeley National Laboratory and GridTracker, Queued Up data file (2026 edition), CC BY 4.0. Modified by Inframation: non-ISO and MISO regions only; MISO rows labelled with the date the file's queue data runs to; statuses and technologies mapped to Inframation's vocabulary. Queued Up Data File. Copyright (c) 2026, The Regents of the University of California, through Lawrence Berkeley National Laboratory (subject to receipt of any required approvals from the U.S. Dept. of Energy) & GridTracker.

Attribution