Plains LPG Services LP, Rancho San Pedro Terminal
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- In development
- Under construction
- Other infrastructure
PLAINS LPG SERVICES LP, RANCHO SAN PEDRO TERMINAL: location and 10 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Plains LPG Services LP, Rancho San Pedro Terminal
Petroleum product terminal
As filed: PLAINS LPG SERVICES LP, RANCHO SAN PEDRO TERMINAL
Key facts
Petroleum product terminal Operating- Location
- California
Details
Who’s behind it
- Owner
- Plains LPG ServicesSourceEIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Capacity not stated
All 5 attributes from EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
| Attribute | Value |
|---|---|
| Padd | 5 |
| Site | RANCHO SAN PEDRO TERMINAL |
| Survey | EIA-815 |
| Owner, as the source states it | PLAINS LPG SERVICES LP |
| Source release | 202109 |
Sources
2 sourcesSources EIA Energy Atlas · EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Sources
- EIA Energy AtlasSource: U.S. Energy Information Administration, U.S. Energy Atlas, Petroleum Product Terminals (as of September 2021)
- EIA US Energy Atlas — Petroleum Product Terminals (points; owner company, EIA-815)
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| San Pedro Public Market (SPPM) Under construction | Solar | 2.4 mi | 1.2 |
| Elevate Pier S Filed | Battery storage | 4.0 mi | 70 |
| Watson Cogeneration Withdrawn | Gas, combined cycle | 4.6 mi | 94.2 |
| Torrance Dis Ctr 2 - SLLAX100 Under construction | Solar | 5.7 mi | 1.4 |
| Dominguez - SLLAX512 Under construction | Solar | 6.4 mi | 1.3 |
| South Bay Dis Ctr 12 - SLLAX104 Under construction | Solar | 6.7 mi | 1.2 |
| South Bay Dis Ctr 6-SLLAX680 Under construction | Solar | 6.8 mi | 1.3 |
| Fordyce - SLLAX680 Under construction | Solar | 6.8 mi | 1.3 |
| Scattergood Postponed | Gas, combined cycle | 13.1 mi | 346 |
| Cobalt Under construction | Solar + storage | 14.9 mi | 250 |