Show on map
Pleasant Garden 230 kV line — Transmission lineBig Boy Solar — Postponed · Solar · NC · 3 MW · 3.6 mi awayWest River Solar, LLC — Under construction · Solar · NC · 40 MW · 4.0 mi awayClimax Solar — Postponed · Solar · NC · 5 MW · 5.0 mi awayAdams Solar — Postponed · Solar · NC · 2 MW · 6.6 mi awayBeth Solar — Postponed · Solar · NC · 5 MW · 7.3 mi awayCharlie Solar — Postponed · Solar · NC · 4.5 MW · 7.8 mi awayLotus Solar — Postponed · Solar · NC · 4 MW · 9.0 mi awayPinewood Solar Center LLC — Postponed · Solar · NC · 5 MW · 10.0 mi awayOsceola Solar, LLC — Postponed · Solar · NC · 5 MW · 10.0 mi awayHawkins Solar — Postponed · Solar · NC · 5 MW · 10.1 mi awayOstrich Farm — Postponed · Solar · NC · 5 MW · 10.8 mi awayReidsville Energy Center — Postponed · Gas, combined cycle · NC · 543.9 MW · 11.2 mi awayKatherine Solar — Postponed · Solar · NC · 5 MW · 11.5 mi away
  • Wind & solar
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Pleasant Garden 230 kV line

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-NC

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Mapped route length (miles)
21
Substations at the ends (as the source names them)
Pleasant Garden
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID110756
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Big Boy Solar Postponed Solar 3.6 mi 3
West River Solar, LLC Under construction Solar 4.0 mi 40
Climax Solar Postponed Solar 5.0 mi 5
Adams Solar Postponed Solar 6.6 mi 2
Beth Solar Postponed Solar 7.3 mi 5
Charlie Solar Postponed Solar 7.8 mi 4.5
Lotus Solar Postponed Solar 9.0 mi 4
Pinewood Solar Center LLC Postponed Solar 10.0 mi 5
Osceola Solar, LLC Postponed Solar 10.0 mi 5
Hawkins Solar Postponed Solar 10.1 mi 5
Ostrich Farm Postponed Solar 10.8 mi 5
Reidsville Energy Center Postponed Gas, combined cycle 11.2 mi 543.9
Katherine Solar Postponed Solar 11.5 mi 5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution