Show on map
Pome BESS — Power plant · Storage · MN8 Energy LLCPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 0.5 mi awayRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 4.7 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 10.1 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 10.4 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 10.6 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 11.0 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 11.2 mi awayEnterprise BESS — Permitted · Storage · CA · 54.1 MW · 13.5 mi awayDon Lee BESS 1 LLC — Postponed · Storage · CA · 6.5 MW · 14.0 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2025
Grid
138 kV to San Diego Gas & Electric Co (CISO)
Location
San Diego County, California
Operated by
MN8 Energy LLC

Output

Net generation MWh by year, 2025 to 2026

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
1 year since 2025
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
138
Transmission owner
San Diego Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-7,903
Balancing authority codeCISO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -7903.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
MN8 Energy LLC Operator EIA-860M
Pome BESS LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Pomerado Energy Storage, LLC Postponed Storage 0.5 mi 6
Rancho Penasquitos Under construction Hydro 4.7 mi 4.3
L3 Harris San Diego Under construction Solar 10.1 mi 1.6
EnerSmart Murray BESS Postponed Storage 10.4 mi 21
EnerSmart Mesa Heights Sub Station Under construction Storage 10.6 mi 3
Alvarado Hydro Facility Postponed Hydro 11.0 mi 1.4
EnerSmart El Cajon BESS Postponed Storage 11.2 mi 3
Enterprise BESS Permitted Storage 13.5 mi 54.1
Don Lee BESS 1 LLC Postponed Storage 14.0 mi 6.5

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution