Prairie Center Energy LLC
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2024
- Net generation, 2025
- -1,406 MWh
- Grid
- 12 kV to United Power, Inc (WACM)
- Location
- Adams County, Colorado
- Operated by
- Whetstone Power Operations LLC
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -1,406 |
| Balancing authority code | WACM |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -1406.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Whetstone Power Operations LLC | Operator | EIA-860M | ||
| Prairie Enhanced, LLC | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Crusoe Brighton Buildout TI Filed | Large load | 5.9 mi | |
| SAMARITANS PURSE DATA CENTER Built | Large load | 10.7 mi | |
| Spindle BESS Under construction | Storage | 12.5 mi | 199 |
| JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Built | Large load | 12.6 mi | |
| LOCKHEED MARTIN - DENVER DATA CENTER Built | Large load | 13.0 mi | |
| Front Range Project Postponed | Biomass | 13.1 mi | 1.6 |
| CORESITE REAL ESTATE DE3 - CORESITE DE3 Built | Large load | 13.4 mi | |
| IRON MOUNTAIN DATA CENTERS - FORTRUST Built | Large load | 14.0 mi | |
| QTS AURORA LLC - QTS DEN1 Built | Large load | 14.2 mi | |
| AMAZON DATA SERVICES - DEN-22 Built | Large load | 14.2 mi | |
| Pivot Solar 43 LLC Under construction | Solar | 14.2 mi | 3.5 |
| Pivot Solar 53 LLC Under construction | Solar | 14.2 mi | 4 |
| DEN1-DC2 (Aurora data centre) Filed | Large load | 14.3 mi | |
| APA060 - Phase 5 MDC (Aurora data centre) Built | Large load | 14.5 mi | |
| JPMORGAN CHASE - PROJECT SYCAMORE AURORA Built | Large load | 14.8 mi |