Project #1 - Bedford #1 and #2 LFs — RNG project · Landfill gas direct use · Network Energy of Lake County, Inc.CMH050 — Built · Large load · OH · 8.1 mi awaySTACK NAL01B (New Albany data centre) — Filed · Large load · OH · 8.1 mi awayCMH082 CAMPUS — Built · Large load · OH · 8.8 mi awayVantage OH 12 — Filed · Large load · OH · 9.1 mi awayFlint — Under construction · Storage · OH · 200 MW · 9.4 mi awaySouth Site Data Center Energy Center — Filed · Large load · OH · 9.5 mi awayCMH137 — Filed · Large load · OH · 9.7 mi awayCyrusOne COL-1 — Filed · Large load · OH · 9.7 mi awayBZI Crane (ECX CMH03) — Filed · Large load · OH · 9.9 mi awayCMH03 — Filed · Large load · OH · 10.3 mi awayUnion Ridge Solar — Under construction · Solar · OH · 108 MW · 11.0 mi awayCOLOGIX — Built · Large load · OH · 11.8 mi awayKYNDRYL, INC. — Built · Large load · OH · 14.5 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1 - Bedford #1 and #2 LFs

RNG project · Landfill gas direct use

Key facts

RNG project · Landfill gas direct use Retired
Location
Franklin County, Ohio
Operated by
Network Energy of Lake County, Inc.SourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Boiler
Technology
Landfill gas direct use
LFG flow to project
2 MMscf/d
Host landfill
Bedford #1 and #2 LFs
Start year
1992

Capacity not stated

All 8 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Landfill opened1970
Landfill closure year1995
Project shutdown year2008
Waste in place (tons)2,664,190
Landfill gas collected (MMscf/d)2
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CMH050 Built Large load 8.1 mi
STACK NAL01B (New Albany data centre) Filed Large load 8.1 mi
CMH082 CAMPUS Built Large load 8.8 mi
Vantage OH 12 Filed Large load 9.1 mi
Flint Under construction Storage 9.4 mi 200
South Site Data Center Energy Center Filed Large load 9.5 mi
CMH137 Filed Large load 9.7 mi
CyrusOne COL-1 Filed Large load 9.7 mi
BZI Crane (ECX CMH03) Filed Large load 9.9 mi
CMH03 Filed Large load 10.3 mi
Union Ridge Solar Under construction Solar 11.0 mi 108
COLOGIX Built Large load 11.8 mi
KYNDRYL, INC. Built Large load 14.5 mi

Sources EPA ICIS-Air · FAA OE/AAA · EIA-860M