Project #1, De-Expansion #1 - Fall River Landfill — RNG project · Landfill gas to electricity · Fortistar Methane GroupSalt Cod BESS — Filed · Storage · MA · 168 MW · 2.4 mi awayCONGRUITY 360 LLC — Built · Large load · MA · 4.1 mi awayBorrego - Highland Ave — Under construction · Solar + storage · MA · 10 MW · 6.6 mi awayTiverton Power Plant — Postponed · Gas, combined cycle · RI · 289.8 MW · 8.2 mi awayBraley Hill North Solar — Under construction · Solar + storage · MA · 10 MW · 10.6 mi awayFeatherbed Lane South Solar — Under construction · Solar + storage · MA · 2 MW · 10.9 mi awayClems Way Solar — Permitted · Solar · MA · 5 MW · 11.0 mi awaySnipatuit Road Solar — Under construction · Solar + storage · MA · 8 MW · 11.6 mi awayMA Acushnet 540R Main St — Filed · Solar + storage · MA · 6 MW · 11.7 mi awayLogging Swamp North — Permitted · Solar · MA · 5 MW · 11.8 mi awayLogging Swamp South — Permitted · Solar · MA · 5 MW · 11.8 mi awayCushman Road Solar — Filed · Solar + storage · MA · 6 MW · 12.0 mi awayBlueWave Capital-Mattapoisett (SREC II) — Postponed · Solar · MA · 4.5 MW · 14.7 mi awayRandall Lane Solar — Under construction · Solar + storage · MA · 10 MW · 14.9 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #1, De-Expansion #1 - Fall River Landfill

RNG project · Landfill gas to electricity

Key facts

RNG project · Landfill gas to electricity Retired
Location
Bristol County, Massachusetts

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Reciprocating Engine
Technology
Landfill gas to electricity
Rated capacity
2.1 MW
LFG flow to project
0.2 MMscf/d
Start year
2006

Capacity not stated

All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Actual generation (MW)0.240
Landfill opened1940
Landfill closure year2014
Project shutdown year2012
Waste in place (tons)5,736,457
Waste in place, year2014
Landfill design capacity (tons)6,849,871
Landfill gas collected (MMscf/d)2.54
Landfill gas generated (MMscf/d)4.66
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
REPUBLIC SERVICES INC Owner 100.0% Dec 31, 2023 EPA GHGRP
Fortistar Methane Group Operator EPA LMOP

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Salt Cod BESS Filed Storage 2.4 mi 168
CONGRUITY 360 LLC Built Large load 4.1 mi
Borrego - Highland Ave Under construction Solar + storage 6.6 mi 10
Tiverton Power Plant Postponed Gas, combined cycle 8.2 mi 289.8
Braley Hill North Solar Under construction Solar + storage 10.6 mi 10
Featherbed Lane South Solar Under construction Solar + storage 10.9 mi 2
Clems Way Solar Permitted Solar 11.0 mi 5
Snipatuit Road Solar Under construction Solar + storage 11.6 mi 8
MA Acushnet 540R Main St Filed Solar + storage 11.7 mi 6
Logging Swamp North Permitted Solar 11.8 mi 5
Logging Swamp South Permitted Solar 11.8 mi 5
Cushman Road Solar Filed Solar + storage 12.0 mi 6
BlueWave Capital-Mattapoisett (SREC II) Postponed Solar 14.7 mi 4.5
Randall Lane Solar Under construction Solar + storage 14.9 mi 10

Sources EIA-860M · EPA ICIS-Air