Show on map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- In development
- Under construction
- Other infrastructure
Project #2 - Altamont Landfill & Resource Recovery Facility: location and 15 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #2 - Altamont Landfill & Resource Recovery Facility
RNG project · Landfill gas to electricity
Key facts
RNG project · Landfill gas to electricity Retired- Location
- Alameda County, California
- Operated by
- WM Energy Solutions, Inc.SourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Project type
- Reciprocating Engine
- Technology
- Landfill gas to electricity
- Rated capacity
- 2.7 MW
- LFG flow to project
- 1.44 MMscf/d
- Host landfill
- Altamont Landfill & Resource Recovery Facility
- Start year
- 2002
Capacity not stated
All 12 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Actual generation (MW) | 2.70 |
| Landfill opened | 1980 |
| Landfill closure year | 2051 |
| Project shutdown year | 2018 |
| Waste in place (tons) | 68,280,716 |
| Waste in place, year | 2022 |
| Landfill design capacity (tons) | 119,799,566 |
| Landfill gas collected (MMscf/d) | 6.06 |
| Landfill gas generated (MMscf/d) | 9.03 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Rooney Ranch Filed | Wind | 0.9 mi | 21 |
| Sand Hill A Filed | Wind | 2.7 mi | 13.5 |
| Sand Hill B Filed | Wind | 3.3 mi | 17 |
| Sand Hill C Contracted | Wind | 3.6 mi | 80.8 |
| Buena Vista Energy LLC Postponed | Storage | 3.8 mi | 100 |
| Tres Vaqueros Wind Farms LLC Withdrawn | Wind | 4.8 mi | 28.3 |
| Mulqueeney Wind Energy Under construction | Wind | 5.2 mi | 80 |
| TESLA Power Project Postponed | Gas, combined cycle | 5.2 mi | 1,322 |
| Aramis I Solar Project × 2 units Under construction | Storage | 6.0 mi | 200 |
| Tracy BESS Under construction | Storage | 9.5 mi | 40 |
| Zeus BESS Contracted | Storage | 9.6 mi | 200 |
| NorCal FPV 1 Under construction | Solar | 10.6 mi | 10 |
| NorCal FPV 1 (Pond 2) Under construction | Solar | 10.6 mi | 1.8 |
| Tracy Renewable Power Plant Under construction | Biomass | 12.7 mi | 5 |