Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Size not stated
- Other infrastructure
Project #2, Rio Hondo - Puente Hills LF: location and 8 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Project #2, Rio Hondo - Puente Hills LF
RNG project · Landfill gas direct use
Key facts
RNG project · Landfill gas direct use Retired- Location
- Los Angeles County, California
- Operated by
- Sanitation Districts of Los Angeles County, CASourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
- Project type
- Boiler
- Technology
- Landfill gas direct use
- LFG flow to project
- 0.3 MMscf/d
- Start year
- 1984
Capacity not stated
All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
| Attribute | Value |
|---|---|
| Landfills | 1 |
| Landfill opened | 1957 |
| Landfill closure year | 2013 |
| Project shutdown year | 2002 |
| Waste in place (tons) | 142,250,454 |
| Waste in place, year | 2013 |
| Landfill design capacity (tons) | 142,400,000 |
| Landfill gas collected (MMscf/d) | 24.33 |
| Direct emission reductions (MMTCO2e/yr) | 0 |
| Avoided emissions (MMTCO2e/yr) | 0 |
Timeline
- In service · EPA LMOP
Around this asset
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CPA 3777 Workman Postponed | Solar | 2.0 mi | 1.9 |
| Marici Under construction | Storage | 3.5 mi | 400 |
| Gabriel Under construction | Storage | 6.5 mi | 400 |
| Bandini - SLLAX710 Under construction | Solar | 7.8 mi | 1.3 |
| California Institute of Technology Postponed | Gas, combined cycle | 10.7 mi | 16.5 |
| Glenarm BESS Plant Filed | Storage | 11.0 mi | 25 |
| PRIME DATA CENTER VERNON Built | Large load | 12.9 mi | |
| Scholl Canyon Under construction | Biomass | 14.2 mi | 12 |
Sources EIA-860M · CAISO · EPA ICIS-NPDES