Show on map
Project #4, Clean Fuels Project - Puente Hills LF — RNG project · Renewable natural gas · Sanitation Districts of Los Angeles County, CACPA 3777 Workman — Postponed · Solar · CA · 1.9 MW · 2.0 mi awayMarici — Under construction · Storage · CA · 400 MW · 3.5 mi awayGabriel — Under construction · Storage · CA · 400 MW · 6.5 mi awayBandini - SLLAX710 — Under construction · Solar · CA · 1.3 MW · 7.8 mi awayCalifornia Institute of Technology — Postponed · Gas, combined cycle · CA · 16.5 MW · 10.7 mi awayGlenarm BESS Plant — Filed · Storage · CA · 25 MW · 11.0 mi awayPRIME DATA CENTER VERNON — Built · Large load · CA · 12.9 mi awayScholl Canyon — Under construction · Biomass · CA · 12 MW · 14.2 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • Other infrastructure
  • 10 · 100 · 1,000 MW

Project #4, Clean Fuels Project - Puente Hills LF

RNG project · Renewable natural gas

Key facts

RNG project · Renewable natural gas Retired
Location
Los Angeles County, California
Operated by
Sanitation Districts of Los Angeles County, CASourceEPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Project type
Vehicle Fuel
Technology
Renewable natural gas
LFG flow to project
0.36 MMscf/d
Start year
1993

Capacity not stated

All 10 attributes from EPA Landfill Methane Outreach Program (LMOP) Landfill and Project Database — landfill gas energy projects (owner/developer, project type, capacity, status)
Attributes
AttributeValue
Landfills1
Landfill opened1957
Landfill closure year2013
Project shutdown year2007
Waste in place (tons)142,250,454
Waste in place, year2013
Landfill design capacity (tons)142,400,000
Landfill gas collected (MMscf/d)24.33
Direct emission reductions (MMTCO2e/yr)0
Avoided emissions (MMTCO2e/yr)0

Timeline

  • In service · EPA LMOP

Around this asset

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
CPA 3777 Workman Postponed Solar 2.0 mi 1.9
Marici Under construction Storage 3.5 mi 400
Gabriel Under construction Storage 6.5 mi 400
Bandini - SLLAX710 Under construction Solar 7.8 mi 1.3
California Institute of Technology Postponed Gas, combined cycle 10.7 mi 16.5
Glenarm BESS Plant Filed Storage 11.0 mi 25
PRIME DATA CENTER VERNON Built Large load 12.9 mi
Scholl Canyon Under construction Biomass 14.2 mi 12

Sources EIA-860M · CAISO · EPA ICIS-NPDES

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO
  • EPA ICIS-NPDESOpen license · retrieved Nov 16, 2026

Attribution