Show on map
Prologis L.P — Power plant · Solar · PowerflexTESLA Power Project — Postponed · Gas, combined cycle · CA · 1,322 MW · 2.0 mi awayTracy BESS — Under construction · Storage · CA · 40 MW · 2.4 mi awayZeus BESS — Contracted · Storage · CA · 200 MW · 2.4 mi awayMulqueeney Wind Energy — Under construction · Wind · CA · 80 MW · 3.8 mi awaySand Hill B — Filed · Wind · CA · 17 MW · 4.2 mi awaySand Hill A — Filed · Wind · CA · 13.5 MW · 4.5 mi awaySand Hill C — Contracted · Wind · CA · 80.8 MW · 4.8 mi awayTracy Renewable Power Plant — Under construction · Biomass · CA · 5 MW · 6.6 mi awayRooney Ranch — Filed · Wind · CA · 21 MW · 6.7 mi awayBuena Vista Energy LLC — Postponed · Storage · CA · 100 MW · 9.3 mi awayTres Vaqueros Wind Farms LLC — Withdrawn · Wind · CA · 28.3 MW · 11.9 mi awayAramis I Solar Project — Under construction · Storage · CA · 100 MW · 13.0 mi awayAramis I Solar Project — Under construction · Solar · CA · 100 MW · 13.0 mi away
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

Prologis L.P

Power plant · Solar

Key facts

Power plant · Solarran 22% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2018
Net generation, 2025
5,860 MWh
Grid
0.5 kV to Pacific Gas & Electric Co. (CISO)
Location
San Joaquin County, California
Operated by
Powerflex

Output

Net generation MWh by year, 2021 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
8 years since 2018
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817372
Location id
L100000814581
Eia plant ids
64600
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
0.500
Transmission owner
Pacific Gas & Electric Co.
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 202519,996
Capacity factor, 20250.223
Net generation (MWh), 20255,860
Balancing authority codeCISO

Solar array

Array area (acres)
13.5
AC capacity (MW)
3
DC capacity (MW)
3.8
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2018

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Powerflex Operator EIA-860M
Prologis, L.P. Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
TESLA Power Project Postponed Gas, combined cycle 2.0 mi 1,322
Tracy BESS Under construction Storage 2.4 mi 40
Zeus BESS Contracted Storage 2.4 mi 200
Mulqueeney Wind Energy Under construction Wind 3.8 mi 80
Sand Hill B Filed Wind 4.2 mi 17
Sand Hill A Filed Wind 4.5 mi 13.5
Sand Hill C Contracted Wind 4.8 mi 80.8
Tracy Renewable Power Plant Under construction Biomass 6.6 mi 5
Rooney Ranch Filed Wind 6.7 mi 21
Buena Vista Energy LLC Postponed Storage 9.3 mi 100
Tres Vaqueros Wind Farms LLC Withdrawn Wind 11.9 mi 28.3
Aramis I Solar Project × 2 units Under construction Storage 13.0 mi 200

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 13, 2026Source: California ISO

Attribution