Puente Hills Energy Recovery
Power plant · Biomass
Key facts
Power plant · Biomassran 34% of 2025 Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1986
- Net generation, 2025
- 149,853 MWh
- Grid
- 66 kV to Southern California Edison Co (CISO)
- Location
- Los Angeles County, California
- Operated by
- Los Angeles County Sanitation
Output
- Biomass and waste
Details
Who’s behind it
Interested in this project?
- Technology
- Biomass source: “Landfill Gas”
- Age
- 40 years since 1986
- Heat rate
- 13,592 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Fuel burned (MMBtu), 2025 | 2,036,865 |
| Capacity factor, 2025 | 0.342 |
| Heat rate (Btu/kWh), 2025 | 13,592.4 |
| Net generation (MWh), 2025 | 149,853 |
| Balancing authority code | CISO |
Retirement
EIA-860M September 2026StatusSome generators have retired; the rest of the plant is still in service. As of EIA-860M for September 2026.- Capacity retired
- 12.7 MW
- Generators retired
- 4
- Capacity still in service
- 50 MW
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| GEN2 | Landfill Gas | 2.8 MW | Retired | January 2013 |
| GEN3 | Landfill Gas | 3.3 MW | Retired | December 2016 |
| GEN4 | Landfill Gas | 3.3 MW | Retired | December 2016 |
| GEN5 | Landfill Gas | 3.3 MW | Retired | December 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 66 kV
- Transmission or distribution system owner
- Southern California Edison Co
- Balancing authority
- California Independent System Operator
- NERC region
- WECC
Transmission lines within 15 mi (10)
Connection points within 15 mi (2)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| COUNTY OF LOS ANGELES CALIFORNIA | Owner | 100.0% | Dec 31, 2023 | EPA GHGRP |
| Los Angeles County Sanitation | Operator | EIA-860M |
Timeline
- Stated Units GEN3, GEN4, GEN5 scheduled to retire, 9.9 MW · EIA-860M
- Stated Unit GEN2 scheduled to retire, 2.8 MW · EIA-860M
- In service · EIA-860M
Sources
7 sourcesSources EIA-860M · GEM · LBNL · CAISO · EIA · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT) · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| CPA 3777 Workman Postponed | Solar | 0.9 mi | 1.9 |
| Marici Under construction | Storage | 4.6 mi | 400 |
| Gabriel Under construction | Storage | 6.7 mi | 400 |
| Bandini - SLLAX710 Under construction | Solar | 6.9 mi | 1.3 |
| California Institute of Technology Postponed | Gas, combined cycle | 9.9 mi | 16.5 |
| Glenarm BESS Plant Filed | Battery storage | 10.1 mi | 25 |
| PRIME DATA CENTER VERNON Built | Large load | 11.9 mi | |
| Scholl Canyon Under construction | Biomass | 13.3 mi | 12 |
| LATTC South Campus Solar Postponed | Solar | 14.1 mi | 1.1 |