Show on map
Queen Creek Solar Farm — Power plant · Solar · Siete Solar LLCAWS Data Center — Filed · Large load · AZ · 1.9 mi awayMECP1 MESA INTERMEDIATE 1 — Built · Large load · AZ · 4.0 mi awayEdged Data Center — Filed · Large load · AZ · 4.9 mi awayNDA MESA DATA CENTER — Built · Large load · AZ · 5.0 mi awayEdgeCore — Under construction · Large load · AZ · 5.4 mi awayPLATYPUS DEVELOPMENT — Built · Large load · AZ · 5.5 mi awayMesa Data Center — Under construction · Large load · AZ · 5.5 mi awayNTT Ph4 POINT 2 — Filed · Large load · AZ · 6.0 mi awayNTT PH1 DATA CENTER — Under construction · Large load · AZ · 6.1 mi awayCOMARCH PHOENIX DATA CENTER — Built · Large load · AZ · 6.3 mi awayEdgeconnex — Filed · Large load · AZ · 6.4 mi awayNTT PH 5 — Filed · Large load · AZ · 6.7 mi awayRED HAWK PH 3 (Mesa data centre) — Filed · Large load · AZ · 6.9 mi awayMICROSOFT PHX 16 DATA CENTER — Under construction · Large load · AZ · 6.9 mi awayCopper Crossing Energy and Research Cent — Postponed · Gas, combustion turbine · AZ · 1,779 MW · 10.7 mi away
  • Wind & solar
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Queen Creek Solar Farm

Power plant · Solar

Key facts

Power plant · Solarran 21% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2012
Net generation, 2025
34,766 MWh
Grid
69 kV to Salt River Project (SRP)
Location
Maricopa County, Arizona
Operated by
Siete Solar LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2012 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
14 years since 2012
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817387
Location id
L100000814596
Eia plant ids
57883
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
69
Transmission owner
Salt River Project
Balancing authority code
SRP
Balancing authority name
Salt River Project
Fuel burned (MMBtu), 2025118,621
Capacity factor, 20250.209
Net generation (MWh), 202534,766
Balancing authority codeSRP

Solar arrays

Array area (acres)
119.1
AC capacity (MW)
19
DC capacity (MW)
25.2
Mounting
Single-axis tracking
Site type
Greenfield
Began operating
2012

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Timeline

  • In service · EIA-860M

Sources

5 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
AWS Data Center Filed Large load 1.9 mi
MECP1 MESA INTERMEDIATE 1 Built Large load 4.0 mi
Edged Data Center Filed Large load 4.9 mi
NDA MESA DATA CENTER Built Large load 5.0 mi
EdgeCore Under construction Large load 5.4 mi
PLATYPUS DEVELOPMENT Built Large load 5.5 mi
Mesa Data Center Under construction Large load 5.5 mi
NTT Ph4 POINT 2 Filed Large load 6.0 mi
NTT PH1 DATA CENTER Under construction Large load 6.1 mi
COMARCH PHOENIX DATA CENTER Built Large load 6.3 mi
Edgeconnex Filed Large load 6.4 mi
NTT PH 5 Filed Large load 6.7 mi
RED HAWK PH 3 (Mesa data centre) Filed Large load 6.9 mi
MICROSOFT PHX 16 DATA CENTER Under construction Large load 6.9 mi
Copper Crossing Energy and Research Cent Postponed Gas, combustion turbine 10.7 mi 1,779

Sources FAA OE/AAA · EPA ICIS-Air · EPA ICIS-NPDES · EIA-860M

Sources

Attribution