R Madison: location and 7 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
R Madison
Power plant · Oil
Key facts
Power plant · Oil Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1962
- Net generation, 2004
- 0 MWh
- Location
- New Castle County, Delaware
- Operated by
- Conectiv Delmarva Gen IncSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 64 years since 1962
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- December 2004
- Capacity retired
- 12 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| MAD | Petroleum Liquids | 12 MW | Retired | December 2004 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit MAD scheduled to retire, 12 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| JP MORGAN CHASE - 4001 GOVERNOR PRINTZ BLVD Built | Large load | 2.8 mi | |
| Deepwater Postponed | Gas, combustion turbine | 4.6 mi | 456 |
| JP MORGAN CHASE - BEAR CHRISTIANA ROAD Built | Large load | 7.8 mi | |
| Carneys Point Solar 1 LLC Under construction | Solar | 8.4 mi | 3 |
| DXC TECHNOLOGY SERVICES LLC Built | Large load | 9.5 mi | |
| LNH INC DBA HOSTING.COM - 350 PENCADER Built | Large load | 13.4 mi | |
| LNH INC DBA HOSTING.COM - 650 PENCADER Built | Large load | 13.5 mi |
Sources EPA ICIS-Air · EIA-860M