Show on map
Ranchtown — Power plant · Storage · ENGIE North AmericaUTSA TEP II — Oil · TX · 3 MW · 12.0 km awayVantage TX22 — Large load · TX · 16.0 km awayMICROSOFT — Large load · TX · 16.1 km awaySPECIAL PROJ - SAT14 DATA CENT SHELL - BLDGS 1-3 — Large load · TX · 16.6 km awaySAT2 SAT3 SAT4 — Large load · TX · 17.2 km awaySTA1 — Large load · TX · 17.6 km awaySTREAM DATACENTER — Large load · TX · 18.8 km awayAMAZON WEB SERVICE DATA CENTER — Large load · TX · 20.8 km awayEX WEST GREEN DATA CENTER — Large load · TX · 21.2 km awaySAT 40 DATA CENTER — Large load · TX · 23.0 km awayVantage TX 12 — Large load · TX · 23.1 km awayAMAZON DATA CENTER SH 211 — Large load · TX · 23.6 km away
  • Storage
  • Loads
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2021
Net generation, 2025
-546 MWh
Grid
34 kV to City of San Antonio - (TX) (ERCO)
Location
Bexar County, Texas
Operated by
ENGIE North AmericaSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
5 years since 2021
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
34.50
Transmission owner
City of San Antonio - (TX)
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-546
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -546.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
UTSA TEP II Postponed Oil 12.0 km 3
Vantage TX22 Built Large load 16.0 km
MICROSOFT Built Large load 16.1 km
SPECIAL PROJ - SAT14 DATA CENT SHELL - BLDGS 1-3 Under construction Large load 16.6 km
SAT2 SAT3 SAT4 Built Large load 17.2 km
STA1 Built Large load 17.6 km
STREAM DATACENTER Built Large load 18.8 km
AMAZON WEB SERVICE DATA CENTER Built Large load 20.8 km
EX WEST GREEN DATA CENTER Built Large load 21.2 km
SAT 40 DATA CENTER Built Large load 23.0 km
Vantage TX 12 Built Large load 23.1 km
AMAZON DATA CENTER SH 211 Built Large load 23.6 km