Show on map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
- 10 · 100 · 1,000 MW
Map
- Wind & solar
- Storage
- Bioenergy
- Loads
- In development
- Under construction
- Operating
- Stage not stated
- Size not stated
- Other infrastructure
Ravenswood 115 kV line: route and 20 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Ravenswood 115 kV line
Transmission line
- Mapped route length
- Mapped route length: sourceLBNL · Open license, with creditmiles
- Voltage
- 115 kV
- States crossed
- US-CA
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Mapped route length (miles)
- 7
- Substations at the ends (as the source names them)
- Ravenswood
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
| Attribute | Value |
|---|---|
| HIFLD line ID | 306488 |
| Voltage class | 100-161 kV |
Sources
1 sourceSources LBNL
Sources
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
Around this line
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| 888 Ross Data Center Filed | Large load | 2.2 mi | |
| Gateway#1&2 (Newark CA) Announced | Solar | 5.3 mi | 1.1 |
| 7999 Gateway Solar Under construction | Solar | 5.4 mi | 4.6 |
| SV8 DATA CENTER Unknown | Large load | 5.9 mi | |
| Waste Management Tri-Cities LFGTE Postponed | Biomass | 6.0 mi | 4.8 |
| EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown | Large load | 6.0 mi | |
| VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown | Large load | 6.0 mi | |
| Edgecore -3580 Filed | Large load | 6.0 mi | |
| PRIME DATA CENTERS Built | Large load | 6.7 mi | |
| Kifer BESS 1 Under construction | Storage | 6.9 mi | 50 |
| 1200 Memorex Skybox Data Center Filed | Large load | 7.0 mi | |
| 4054 Digital Realty Built | Large load | 7.1 mi | |
| SKYBOX DATA CENTER Built | Large load | 7.4 mi | |
| LBA Data Center West Filed | Large load | 7.7 mi | |
| SJC02 & SJC03 DATA CENTER Unknown | Large load | 7.7 mi | |
| Fremont CA AutoFactory Under construction | Solar | 7.8 mi | 3.8 |
| HAYWARD DATA CENTER Unknown | Large load | 9.2 mi | |
| DC-N (San Jose data centre) Filed | Large load | 10.7 mi | |
| Data Center Filed | Large load | 11.6 mi | |
| Ameresco Ox Mountain Filed | Biomass | 14.3 mi | 3 |
Sources FAA OE/AAA · EIA-860M · EPA ICIS-NPDES · EPA ICIS-Air · CAISO