Show on map
Red Cloud — Power plant · Oil · City of Red Cloud - (NE)
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1953
Net generation, 2025
37 MWh
Grid
14 kV to City of Red Cloud - (NE) (SWPP)
Location
Webster County, Nebraska
Operated by
City of Red Cloud - (NE)SourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
37MWh
Fuel burned, 2025
378MMBtu
Capacity factor, 2025
0.1%
Heat rate, 2025
10,216Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025373780.1%10,216
2024414410.1%10,756
2023374460.1%12,054
2022505450.1%10,900
2021997550.2%7,626
2020576370.1%11,175
2019881,0540.2%11,977
20181021,2540.2%12,294
2017637560.1%12,000
2016627040.1%11,355
2015992,3690.2%23,929
2014601,6070.1%26,783
2013608090.1%13,483
20121191,4220.2%11,950
2011881,0730.2%12,193
20101191,5010.2%12,613
20091171,3700.2%11,709
20081141,2770.2%11,202
20071962,2730.4%11,597
20064054,0760.8%10,064
20054034,0480.8%10,045
20042182,2790.4%10,454
20033683,8460.7%10,451
20022582,6800.5%10,388
20012502,6500.5%10,600
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

Every source and license · Attribution