Show on map
Regis Hearn — Power plant · Storage · Regis Hearn LLCBEACON POINT DATA CENTER PROJECT — Under construction · Large load · TX · 1.3 mi awayM&G Resins USA — Under construction · Other · TX · 28.6 MW · 7.1 mi awaySunscape Renewable Energy — Contracted · Solar + storage · TX · 1,022.8 MW · 11.7 mi awayCumbia Energy Center — Announced · Storage · TX · 200 MW · 12.5 mi away
  • Wind & solar
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Regis Hearn

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2024
Net generation, 2025
-124 MWh
Grid
12 kV to AEP Texas Central Company (ERCO)
Location
Nueces County, Texas
Operated by
Regis Hearn LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2025

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
2 years since 2024
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
AEP Texas Central Company
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-124
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -124.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
BEACON POINT DATA CENTER PROJECT Under construction Large load 1.3 mi
M&G Resins USA Under construction Other 7.1 mi 28.6
Sunscape Renewable Energy Contracted Solar + storage 11.7 mi 1,022.8
Cumbia Energy Center Announced Storage 12.5 mi 200

Sources EPA ICIS-NPDES · EIA-860M · ERCOT

Sources

  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • EIA-860MOpen license · retrieved Nov 4, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution