Rio Pinar
Power plant · Oil
Key facts
Power plant · Oilran 0% of 2015 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1970
- Net generation, 2015
- 66 MWh
- Grid
- 69 kV to Duke Energy Florida, Inc (FPC)
- Location
- Orange County, Florida
- Operated by
- Duke Energy Florida, LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Oil
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Oil source: “Petroleum Liquids”
- Age
- 56 years since 1970
1 attribute from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Balancing authority code | FPC |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- March 2016
- Capacity retired
- 19.2 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| P1 | Petroleum Liquids | 19.2 MW | Retired | March 2016 |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 69 kV
- Transmission or distribution system owner
- Duke Energy Florida, Inc
- Balancing authority
- Progress Energy Florida
- NERC region
- SERC
Transmission lines within 15 mi (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit P1 scheduled to retire, 19.2 MW · EIA-860M
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| VERIZON ORLANDO DATA CENTER Built | Large load | 4.4 mi | |
| Curtis H Stanton Energy Center Postponed | Coal | 6.4 mi | 329 |
| CORESITE REAL ESTATE OR1 LLC Built | Large load | 12.9 mi | |
| COMCAST DATA CENTER Built | Large load | 13.1 mi |
Sources EPA ICIS-NPDES · EIA-860M · EPA ICIS-Air