Riverbend — Power plant · Coal · Duke Energy Carolinas, LLCMcDowell Creek Solar LLC — Solar · NC · 2 MW · 4.7 km awayHornet Solar — Solar · NC · 73 MW · 5.8 km awayDLR Moores Chapel Mobile Crane (Charlotte data centre) — Large load · NC · 12.1 km awayAllen 2 BESS — Storage · NC · 167 MW · 19.0 km awayCLT 16 12MW DATA CENTER — Large load · NC · 19.8 km awayCLT16 - Data Center — Large load · NC · 19.8 km away
  • Combustion
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Retired
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Coal

Key facts

Power plant · Coalran 3% of 2012 Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1952
Net generation, 2012
155,786 MWh
Grid
230 kV to Duke Energy Carolinas, LLC (DUK)
Location
Gaston County, North Carolina

Output

Net generation MWh by year, 2001 to 2013
Fuel burned MMBtu by year, 2001 to 2013
  • Gas
  • Coal
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Coal source: “Conventional Steam Coal”
Age
74 years since 1952
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Parents
Name
Duke Energy Corp
Share pct
100
Gem entity id
E100000001194
Unit ids
G100000108590, G100000108591, G100000108592, G100000108593
Location id
L100000104084
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000348641
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000835
Balancing authority codeDUK

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
May 2013
First unit retired
October 2012
Capacity retired
601.2 MW
Generators retired
8
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
10Natural Gas Fired Combustion Turbine33.8 MWRetiredOctober 2012
11Natural Gas Fired Combustion Turbine33.8 MWRetiredOctober 2012
8Natural Gas Fired Combustion Turbine33.8 MWRetiredOctober 2012
9Natural Gas Fired Combustion Turbine33.8 MWRetiredOctober 2012
4Conventional Steam Coal100 MWRetiredMay 2013
5Conventional Steam Coal100 MWRetiredMay 2013
6Conventional Steam Coal133 MWRetiredMay 2013
7Conventional Steam Coal133 MWRetiredMay 2013
By technology
Nameplate capacity retired or scheduled to retire, by technology
TechnologyRetiredScheduled to retire
Conventional Steam Coal466 MW
Natural Gas Fired Combustion Turbine135.2 MW

Grid

EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).
Grid voltage at the plant
230 kV
Transmission or distribution system owner
Duke Energy Carolinas, LLC
Balancing authority
Duke Energy Carolinas
NERC region
SERC
Transmission lines within 25 km (10)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Duke Energy Carolinas, LLC Operator EIA-860M
Duke Energy Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • Stated Units 4, 5, 6, 7 scheduled to retire, 466 MW · EIA-860M
  • Stated Units 10, 11, 8, 9 scheduled to retire, 135.2 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
McDowell Creek Solar LLC Under construction Solar 4.7 km 2
Hornet Solar Under construction Solar 5.8 km 73
DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed Large load 12.1 km
Allen 2 BESS Announced Storage 19.0 km 167
CLT 16 12MW DATA CENTER Under construction Large load 19.8 km
CLT16 - Data Center Filed Large load 19.8 km