Riverbend: location and 6 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Riverbend
Power plant · Coal
Key facts
Power plant · Coalran 3% of 2012 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1952
- Net generation, 2012
- 155,786 MWh
- Grid
- 230 kV to Duke Energy Carolinas, LLC (DUK)
- Location
- Gaston County, North Carolina
- Operated by
- Duke Energy Carolinas, LLC
Output
- Gas
- Coal
- Oil
Details
Who’s behind it
- Owner
- Duke Energy
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Coal source: “Conventional Steam Coal”
- Age
- 74 years since 1952
All 3 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| EPA greenhouse gas reporting (GHGRP) |
|
| Balancing authority code | DUK |
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- May 2013
- First unit retired
- October 2012
- Capacity retired
- 601.2 MW
- Generators retired
- 8
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| 10 | Natural Gas Fired Combustion Turbine | 33.8 MW | Retired | October 2012 |
| 11 | Natural Gas Fired Combustion Turbine | 33.8 MW | Retired | October 2012 |
| 8 | Natural Gas Fired Combustion Turbine | 33.8 MW | Retired | October 2012 |
| 9 | Natural Gas Fired Combustion Turbine | 33.8 MW | Retired | October 2012 |
| 4 | Conventional Steam Coal | 100 MW | Retired | May 2013 |
| 5 | Conventional Steam Coal | 100 MW | Retired | May 2013 |
| 6 | Conventional Steam Coal | 133 MW | Retired | May 2013 |
| 7 | Conventional Steam Coal | 133 MW | Retired | May 2013 |
By technology
| Technology | Retired | Scheduled to retire |
|---|---|---|
| Conventional Steam Coal | 466 MW | |
| Natural Gas Fired Combustion Turbine | 135.2 MW |
Grid
EIA-860 2025Grid fieldsAs the plant reported them to EIA-860 for 2025 (Schedule 2).- Grid voltage at the plant
- 230 kV
- Transmission or distribution system owner
- Duke Energy Carolinas, LLC
- Balancing authority
- Duke Energy Carolinas
- NERC region
- SERC
Transmission lines within 25 km (10)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Duke Energy Carolinas, LLC | Operator | EIA-860M | ||
| Duke Energy | Owner | 100.0% | 31 Dec 2023 | EPA GHGRP |
Timeline
- Stated Units 4, 5, 6, 7 scheduled to retire, 466 MW · EIA-860M
- Stated Units 10, 11, 8, 9 scheduled to retire, 135.2 MW · EIA-860M
- In service · EIA-860M
Sources
6 sourcesSources EIA-860M · GEM · LBNL · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Sources
- EIA-860M Preliminary Monthly Electric Generator Inventory
- Global Energy Monitor — Global Integrated Power Tracker (unit-level power plants, eight technologies, all statuses)Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- EIA Open Data bulk file — Electricity (ELEC.zip; monthly plant net generation and fuel consumption since 2001)Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT)
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| McDowell Creek Solar LLC Under construction | Solar | 4.7 km | 2 |
| Hornet Solar Under construction | Solar | 5.8 km | 73 |
| DLR Moores Chapel Mobile Crane (Charlotte data centre) Filed | Large load | 12.1 km | |
| Allen 2 BESS Announced | Storage | 19.0 km | 167 |
| CLT 16 12MW DATA CENTER Under construction | Large load | 19.8 km | |
| CLT16 - Data Center Filed | Large load | 19.8 km |
Sources EIA-860M · FAA OE/AAA · EPA ICIS-NPDES