Show on map
Robins — Power plant · Oil · Georgia Power CoSR Robins I — Solar · GA · 250 MW · 13.9 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 0% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1995
Net generation, 2025
4,612 MWh
Grid
115 kV to Georgia Power Co (SOCO)
Location
Houston County, Georgia
Operated by
Georgia Power Co

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
31 years since 1995
Unused energy
1,605 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
13,521 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
115
Transmission owner
Georgia Power Co
Balancing authority code
SOCO
Balancing authority name
Southern Company Services, Inc. - Trans
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110000700055
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1001118
Fuel burned (MMBtu), 202562,358
Capacity factor, 20250.003
Heat rate (Btu/kWh), 202513,520.8
Net generation (MWh), 20254,612
Balancing authority codeSOCO

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
Georgia Power Co Operator EIA-860M
SOUTHERN CO Owner 100.0% 31 Dec 2023 EPA GHGRP

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
SR Robins I Postponed Solar 13.9 km 250

Sources EIA-860M

Sources

Attribution