Show on map
- Combustion
- Storage
- Unspecified fuel
- Loads
- In development
- Under construction
- Operating
- Size not stated
- 10 · 100 · 1,000 MW
Map
- Combustion
- Storage
- Unspecified fuel
- Loads
- In development
- Under construction
- Operating
- Size not stated
Saddleback BESS2: location and 4 exact-grade projects within 25 km. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Saddleback BESS2
Power plant · Storage
Key facts
Power plant · Storage Operating- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 2022
- Net generation, 2025
- -434 MWh
- Grid
- 12 kV to Texas-New Mexico Power Co (ERCO)
- Location
- Reeves County, Texas
- Operated by
- HEN Infrastructure, L.L.C.
Output
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Storage source: “Batteries”
- Age
- 4 years since 2022
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 0 |
| Net generation (MWh), 2025 | -434 |
| Balancing authority code | ERCO |
Data notes (1)
- Capacity factor, 2025 not shown: net generation -434.0 MWh is not positive (the plant consumed at least as much as it produced over the year)
Ownership
4 companies4| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| HEN Infrastructure, L.L.C. | Operator | EIA-860M | ||
| John Hancock Funding Company | Owner | 43.1% | Dec 31, 2025 | EIA-860 |
| Manulife Infrastructure II Holdings A, L.P. | Owner | 52.9% | Dec 31, 2025 | EIA-860 |
| Hunt Energy Network, LLC | Owner | 4.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
4 sourcesSources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 25 km| Project | Kind | Away | MW |
|---|---|---|---|
| Saddleback BESS2 unit SDBTD Under construction | Other | 0.0 km | 9.9 |
| Coyote Springs (TX) Permitted | Oil | 14.3 km | 9.9 |
| NSCALE DATA CENTER - WARD COUNTY Under construction | Large load | 17.4 km | |
| CPV Basin Ranch Energy Center Under construction | Gas, combined cycle | 19.3 km | 1,350 |
Sources EIA-860M · EPA ICIS-NPDES · ERCOT