Show on map
Saddleback BESS2 — Power plant · Storage · HEN Infrastructure, L.L.C.Saddleback BESS2 unit SDBTD — Under construction · Other · TX · 9.9 MW · 0.0 km awayCoyote Springs (TX) — Permitted · Oil · TX · 9.9 MW · 14.3 km awayNSCALE DATA CENTER - WARD COUNTY — Under construction · Large load · TX · 17.4 km awayCPV Basin Ranch Energy Center — Under construction · Gas, combined cycle · TX · 1,350 MW · 19.3 km away
  • Combustion
  • Storage
  • Unspecified fuel
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Saddleback BESS2

Power plant · Storage

Key facts

Power plant · Storage Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2022
Net generation, 2025
-434 MWh
Grid
12 kV to Texas-New Mexico Power Co (ERCO)
Location
Reeves County, Texas

Output

Net generation MWh by year, 2024 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Storage source: “Batteries”
Age
4 years since 2022
All 4 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
12.50
Transmission owner
Texas-New Mexico Power Co
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
Fuel burned (MMBtu), 20250
Net generation (MWh), 2025-434
Balancing authority codeERCO
Data notes (1)
  • Capacity factor, 2025 not shown: net generation -434.0 MWh is not positive (the plant consumed at least as much as it produced over the year)

Ownership

4 companies4
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
HEN Infrastructure, L.L.C. Operator EIA-860M
John Hancock Funding Company Owner 43.1% Dec 31, 2025 EIA-860
Manulife Infrastructure II Holdings A, L.P. Owner 52.9% Dec 31, 2025 EIA-860
Hunt Energy Network, LLC Owner 4.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Saddleback BESS2 unit SDBTD Under construction Other 0.0 km 9.9
Coyote Springs (TX) Permitted Oil 14.3 km 9.9
NSCALE DATA CENTER - WARD COUNTY Under construction Large load 17.4 km
CPV Basin Ranch Energy Center Under construction Gas, combined cycle 19.3 km 1,350

Sources EIA-860M · EPA ICIS-NPDES · ERCOT

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EPA ICIS-NPDESOpen license · retrieved Nov 8, 2026
  • ERCOTOpen license · retrieved Nov 4, 2026

Attribution