Show on map
San Bernardino - Vista 230 kV — Transmission lineSunE Redlands — Postponed · Solar · CA · 1.5 MW · 0.3 mi awayRedlands DC 9 - sline609 — Under construction · Solar + storage · CA · 5 MW · 2.0 mi awaySolar Photovoltaic Project #20 — Postponed · Solar · CA · 3.5 MW · 2.1 mi awaySolar Photovoltaic Project #28 — Postponed · Solar · CA · 0.5 MW · 2.3 mi awaySolar Photovoltaic Project #24 — Postponed · Solar · CA · 4 MW · 3.1 mi awayCA Bloomington 2551 S Lilac Avenue Micro — Under construction · Solar + storage · CA · 3 MW · 3.5 mi awayCA Riverside 2356 Fleetwood Dr. — Under construction · Solar + storage · CA · 4 MW · 4.1 mi awayEnergy Center — Announced · Gas, combustion turbine · CA · 0.9 MW · 4.3 mi awaySolar Photovoltaic Project #30 — Postponed · Solar · CA · 1.5 MW · 6.3 mi awayRCWMD Badlands Landfill Gas Project — Postponed · Biomass · CA · 1.2 MW · 8.3 mi awaySolar Photovoltaic Project #25 — Postponed · Solar · CA · 4.5 MW · 8.5 mi awaySolar Photovoltaic Project #27 — Postponed · Solar · CA · 1 MW · 8.5 mi awayOES Biogas Power — Under construction · Biomass · CA · 2.6 MW · 8.9 mi awaySolar Photovoltaic Project #17 — Postponed · Solar · CA · 0.5 MW · 10.8 mi awaySolar Photovoltaic Project #14 — Postponed · Solar · CA · 1.5 MW · 10.9 mi awayAmazon - Moreno Valley — Postponed · Solar · CA · 2.2 MW · 11.0 mi awaySolar Photovoltaic Project #10 — Postponed · Solar · CA · 0.5 MW · 11.6 mi awaySolar Photovoltaic Project #18 — Postponed · Solar · CA · 0.5 MW · 11.7 mi awaySolar Photovoltaic Project #04 — Postponed · Solar · CA · 1.5 MW · 11.7 mi awaySolar Photovoltaic Project #19 — Postponed · Solar · CA · 5 MW · 11.7 mi awaySolar Photovoltaic Project #23 — Postponed · Solar · CA · 0.5 MW · 11.8 mi awayPerris DC 5 - sline015 — Under construction · Solar · CA · 1.6 MW · 12.5 mi awaySolar Photovoltaic Project #21 — Postponed · Solar · CA · 2.5 MW · 13.6 mi awaySolar Photovoltaic Project #12 — Postponed · Solar · CA · 0.5 MW · 13.9 mi awaySolar Photovoltaic Project #08 — Postponed · Solar · CA · 0.5 MW · 14.1 mi awaySolar Photovoltaic Project #31 — Postponed · Solar · CA · 1 MW · 14.5 mi awaySolar Photovoltaic Project #09 — Postponed · Solar · CA · 0.5 MW · 14.5 mi awayRoadhouse Energy Center — Contracted · Storage · CA · 300 MW · 14.6 mi awayLake Perris Solar — Postponed · Solar · CA · 1.5 MW · 14.9 mi awaySan Jacinto Solar — Postponed · Solar · CA · 1.5 MW · 15.0 mi away
  • Combustion
  • Wind & solar
  • Storage
  • Bioenergy
  • In development
  • Under construction
  • Other infrastructure
  • 10 · 100 · 1,000 MW

San Bernardino - Vista 230 kV

Transmission line

Mapped route length
Mapped route length: sourceLBNL · Open license, with creditmiles
Voltage
230 kV
States crossed
US-CA

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert
More Book a call Join the beta
About these actionsOur team gets you what you need. Beta: private project space · data room · readiness check Want this as data? Free via the API and alerts.
Mapped route length (miles)
8
Substations at the ends (as the source names them)
San Bernardino to Vista
All 2 attributes from LBNL — A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024 (OEDI submission 8742)
Attributes
AttributeValue
HIFLD line ID306438
Voltage class220-287 kV

Sources

1 source

Sources LBNL

Sources

  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.

Every source and license · Attribution

View at source

Around this line

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
SunE Redlands Postponed Solar 0.3 mi 1.5
Redlands DC 9 - sline609 Under construction Solar + storage 2.0 mi 5
Solar Photovoltaic Project #20 Postponed Solar 2.1 mi 3.5
Solar Photovoltaic Project #28 Postponed Solar 2.3 mi 0.5
Solar Photovoltaic Project #24 Postponed Solar 3.1 mi 4
CA Bloomington 2551 S Lilac Avenue Micro Under construction Solar + storage 3.5 mi 3
CA Riverside 2356 Fleetwood Dr. Under construction Solar + storage 4.1 mi 4
Energy Center Announced Gas, combustion turbine 4.3 mi 0.9
Solar Photovoltaic Project #30 Postponed Solar 6.3 mi 1.5
RCWMD Badlands Landfill Gas Project Postponed Biomass 8.3 mi 1.2
Solar Photovoltaic Project #25 Postponed Solar 8.5 mi 4.5
Solar Photovoltaic Project #27 Postponed Solar 8.5 mi 1
OES Biogas Power Under construction Biomass 8.9 mi 2.6
Solar Photovoltaic Project #17 Postponed Solar 10.8 mi 0.5
Solar Photovoltaic Project #14 Postponed Solar 10.9 mi 1.5
Amazon - Moreno Valley Postponed Solar 11.0 mi 2.2
Solar Photovoltaic Project #10 Postponed Solar 11.6 mi 0.5
Solar Photovoltaic Project #18 Postponed Solar 11.7 mi 0.5
Solar Photovoltaic Project #04 Postponed Solar 11.7 mi 1.5
Solar Photovoltaic Project #19 Postponed Solar 11.7 mi 5
Solar Photovoltaic Project #23 Postponed Solar 11.8 mi 0.5
Perris DC 5 - sline015 Under construction Solar 12.5 mi 1.6
Solar Photovoltaic Project #21 Postponed Solar 13.6 mi 2.5
Solar Photovoltaic Project #12 Postponed Solar 13.9 mi 0.5
Solar Photovoltaic Project #08 Postponed Solar 14.1 mi 0.5
Solar Photovoltaic Project #31 Postponed Solar 14.5 mi 1
Solar Photovoltaic Project #09 Postponed Solar 14.5 mi 0.5
Roadhouse Energy Center Contracted Storage 14.6 mi 300
Lake Perris Solar Postponed Solar 14.9 mi 1.5
San Jacinto Solar Postponed Solar 15.0 mi 1.5

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 26, 2026Source: California ISO

Attribution