Santa Clara
Power plant · Biomass
Key facts
Power plant · Biomassran 55% of 2005 Retired- Capacity
- Capacity: sourceEIA-860M · Open licenseMW
- Commissioned
- 1986
- Net generation, 2005
- 6,707 MWh
- Location
- Santa Clara County, California
- Operated by
- Pacific Recovery CorpSourceEIA-860M Preliminary Monthly Electric Generator Inventory
Output
- Gas
- Biomass and waste
Details
Who’s behind it
No companies named in filings yet.
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Landfill Gas”
- Age
- 40 years since 1986
Retirement
EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.- Retired
- November 2005
- Capacity retired
- 1.4 MW
- Generators retired
- 1
| Generator | Technology | Nameplate | State | Date |
|---|---|---|---|---|
| SCLA | Landfill Gas | 1.4 MW | Retired | November 2005 |
Grid
Not in EIA-860Grid fieldsEIA-860 states no grid voltage or transmission owner for this plant: its annual file lists plants with a generator in the report year, so a plant that retired earlier is not in it.Transmission lines within 15 mi (10)
Connection points within 15 mi (1)
Can the connection be reused?
A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.
Timeline
- Stated Unit SCLA scheduled to retire, 1.4 MW · EIA-860M
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory
Sources
- EIA-860M
- LBNLYin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
- CAISOSource: California ISO
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Unknown | Large load | 2.2 mi | |
| Edgecore -3580 Filed | Large load | 2.3 mi | |
| SJC02 & SJC03 DATA CENTER Unknown | Large load | 2.6 mi | |
| SV8 DATA CENTER Unknown | Large load | 2.7 mi | |
| VANTAGE DATA CENTERS MANAGEMENT CO , LLC Unknown | Large load | 2.9 mi | |
| Kifer BESS 1 Under construction | Storage | 3.0 mi | 50 |
| LBA Data Center West Filed | Large load | 3.1 mi | |
| 4054 Digital Realty Built | Large load | 3.2 mi | |
| PRIME DATA CENTERS Built | Large load | 3.4 mi | |
| 888 Ross Data Center Filed | Large load | 3.5 mi | |
| 1200 Memorex Skybox Data Center Filed | Large load | 3.6 mi | |
| SKYBOX DATA CENTER Built | Large load | 3.9 mi | |
| Fremont CA AutoFactory Under construction | Solar | 5.5 mi | 3.8 |
| Waste Management Tri-Cities LFGTE Postponed | Biomass | 5.7 mi | 4.8 |
| DC-N (San Jose data centre) Filed | Large load | 6.7 mi | |
| Data Center Filed | Large load | 7.5 mi | |
| 7999 Gateway Solar Under construction | Solar | 8.2 mi | 4.6 |
| Gateway#1&2 (Newark CA) Announced | Solar | 9.9 mi | 1.1 |
Sources EPA ICIS-NPDES · FAA OE/AAA · EPA ICIS-Air · EIA-860M · CAISO