Show on map
Santa Teresa Solar — Power plant · Solar · Santa Teresa SolarSanta Teresa Solar unit SAN — Under construction · Storage · NM · 150 MW · 0.0 mi awayProject Miner County NM (Santa Teresa data centre) — Filed · Large load · NM · 1.5 mi away
  • Wind & solar
  • Storage
  • Loads
  • In development
  • Under construction
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Santa Teresa Solar

Power plant · Solar

Key facts

Power plant · Solar Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2026
Grid
230 kV to El Paso Electric Co (EPE)
Location
Dona Ana County, New Mexico
Operated by
Santa Teresa SolarSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2026

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
0 years since 2026
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
230
Transmission owner
El Paso Electric Co
Balancing authority code
EPE
Balancing authority name
El Paso Electric Company
Balancing authority codeEPE

Timeline

  • In service · EIA-860M

Sources

3 sources

Sources EIA-860M · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Santa Teresa Solar unit SAN Under construction Storage 0.0 mi 150
Project Miner County NM (Santa Teresa data centre) Filed Large load 1.5 mi

Sources EIA-860M · FAA OE/AAA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • FAA OE/AAAOpen license · retrieved Nov 16, 2026

Attribution