Show on map
- Bioenergy
- Operating
- 10 · 100 · 1,000 MW
Map
- Bioenergy
- Operating
Savannah River Site Biomass Cogen: location and 2 exact-grade projects within 15 mi. Basemap: Protomaps, © OpenStreetMap contributors, ODbL.
Savannah River Site Biomass Cogen
Power plant · Biomass
Output
- Oil
- Biomass and waste
Details
Who’s behind it
Interested in this project?
Set an alert Book a call Join the beta
Our team gets you what you need.
Beta: private project space · data room · readiness check
- Technology
- Biomass source: “Wood/Wood Waste Biomass”
- Age
- 14 years since 2012
- Heat rate
- 25,765 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
| Attribute | Value |
|---|---|
| Gem |
|
| Grid |
|
| Fuel burned (MMBtu), 2025 | 2,386,521 |
| Capacity factor, 2025 | 0.508 |
| Heat rate (Btu/kWh), 2025 | 25,764.6 |
| Net generation (MWh), 2025 | 92,628 |
| Balancing authority code | SCEG |
Ownership
2 companies2| Company | Role | Share | As of | Source |
|---|---|---|---|---|
| Ameresco | Operator | EIA-860M | ||
| U S Department of Energy | Owner | 100.0% | Dec 31, 2025 | EIA-860 |
Timeline
- In service · EIA-860M
Sources
5 sourcesSources EIA-860M · GEM · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Sources
- EIA-860M
- GEMGlobal Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
- EIASource: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
- EIA-860M Preliminary Monthly Electric Generator Inventory
- EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules
Around this plant
Nearby
within 15 mi| Project | Kind | Away | MW |
|---|---|---|---|
| Jackson Solar Postponed | Solar | 8.9 mi | 14 |
| Foreman Solar Postponed | Solar | 13.8 mi | 6.4 |
Sources EIA-860M