Savannah River Site Biomass Cogen — Power plant · Biomass · AmerescoParkway Battery Storage — Power plant · Storage · Parkway Energy Storage LLCRattlesnake Ridge Battery Storage — Power plant · Storage · Rattlesnake Ridge Energy Storage LLCDavis Battery Storage — Power plant · Storage · Davis UP Energy Storage LLCPlatte Valley Battery Storage — Power plant · Storage · Platte Valley Energy Storage LLCKeenesburg Battery Storage — Power plant · Storage · Keenesburg Energy Storage LLCFrederick Battery Storage — Power plant · Storage · Frederick Energy Storage LLCMead Battery Storage — Power plant · Storage · Mead Energy Storage LLCBromley Battery Storage — Power plant · Storage · Bromley Energy Storage LLCProject #2 - All Purpose Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #2 - Buena Vista Drive SLF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Chiquita Canyon SLF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Forward Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Foothill Sanitary Landfill, Inc. — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Johnson Canyon SLF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Keller Canyon LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Neal Road Recycling and Waste Facility — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Ox Mountain SLF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Vasco Road SLF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Expansion #1 - Jones Crossroads Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Sandtown Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Jones Crossroads Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Expansion #1 - Sandtown Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Expansion #1 - Pine Bluff Landfill — RNG project · Landfill gas direct use · Ameresco, Inc.Project #1, De-Expansion #1 - Pine Bluff Landfill — RNG project · Landfill gas direct use · Ameresco, Inc.Project #1 - Pine Bluff Landfill — RNG project · Landfill gas direct use · Ameresco, Inc.Project #2 - Brickyard Disposal & Recycling Inc. — RNG project · Renewable natural gas · Ameresco, Inc.Project #2 - Laubscher Meadows LF — RNG project · Landfill gas direct use · Ameresco, Inc.Project #1 - Benson Valley LF — RNG project · Renewable natural gas · Ameresco, Inc.Project #1 & Expansion #1 - Chicopee Landfill (WMI) — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, De-Expansion #1 - Woodland Meadows Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #2 - Woodland Meadows Landfill — RNG project · Renewable natural gas · Ameresco, Inc.Project #1 - Woodland Meadows Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Jefferson City Sanitary Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, De-Expansion #2 - Al Turi LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Al Turi LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Expansion #1 & De-Expansion #1 - Al Turi LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Re-Expansion #1 - Al Turi LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, De-Expansion #3 - Al Turi LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Palmetto Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #3 - McCarty Road LF — RNG project · Renewable natural gas · Ameresco, Inc.Project #2 - McCarty Road LF — RNG project · Landfill gas direct use · Ameresco, Inc.Project #1 - Davis County Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1, Expansion #1 - Davis County Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Stafford County LF — RNG project · Landfill gas to electricity · Ameresco, Inc.Project #1 - Janesville City/Rock County Landfill — RNG project · Landfill gas to electricity · Ameresco, Inc.Ameresco Butte County — Biomass · CA · 0.2 MW · 0.1 km awayTX Houston 7080 Express Lane — Storage · TX · 1.5 MW · 0.4 km awayJPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL — Large load · CO · 0.9 km awayAmeresco Ox Mountain — Biomass · CA · 3 MW · 1.1 km awayPalmer Renewable Energy — Biomass · MA · 42 MW · 2.0 km away25156403 DATA CTR-STAFFORD TECH CAMPUS PH4 SOUTHCA — Large load · VA · 2.1 km awayAmazon Data Services Inc IAD-175 Stafford Technology Campus — Large load · VA · 2.1 km awayTres Vaqueros Wind Farms LLC — Wind · CA · 28.3 MW · 2.5 km awayGreens Bayou 6 — Gas, combustion turbine · TX · 445 MW · 2.6 km awayIAD350 — Large load · VA · 2.9 km awayAmazon Data Services Inc IAD-350 — Large load · VA · 3.0 km awayEDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT — Large load · CA · 3.6 km awayEdgecore -3580 — Large load · CA · 3.7 km awayAramis I Solar Project — Storage · CA · 100 MW · 3.8 km awayAramis I Solar Project — Solar · CA · 100 MW · 3.8 km awaySJC02 & SJC03 DATA CENTER — Large load · CA · 4.0 km awayStony Brook — Gas, combined cycle · MA · 422 MW · 4.2 km awayCrusoe Brighton Buildout TI — Large load · CO · 4.3 km awaySV8 DATA CENTER — Large load · CA · 4.3 km awayProject Cannoli Data Center — Large load · MI · 4.3 km awaySix Flags Magic Mountain — Solar + storage · CA · 12 MW · 4.3 km awayVantage Data Centers VA41 LLC — Large load · VA · 4.5 km awayVANTAGE DATA CENTERS MANAGEMENT CO , LLC — Large load · CA · 4.7 km awayKifer BESS 1 — Storage · CA · 50 MW · 4.8 km awayFront Range Project — Biomass · CO · 1.6 MW · 4.9 km awayLBA Data Center West — Large load · CA · 5.0 km awayVA 41 (Frederickburg data centre) — Large load · VA · 5.0 km away4054 Digital Realty — Large load · CA · 5.2 km awayPRIME DATA CENTERS — Large load · CA · 5.6 km away888 Ross Data Center — Large load · CA · 5.8 km awayKeenesburg — Solar · CO · 7.2 MW · 5.8 km away1200 Memorex Skybox Data Center — Large load · CA · 5.9 km awayRiverside Holyoke — Hydro · MA · 1.1 MW · 6.0 km awayChicopee BESS — Storage · MA · 5 MW · 6.2 km awaySKYBOX DATA CENTER — Large load · CA · 6.2 km awayFort St Vrain — Gas, combustion turbine · CO · 478 MW · 6.5 km awayRooney Ranch — Wind · CA · 21 MW · 6.5 km awayCA Moss Landing 3040 Hilltop Rd — Solar + storage · CA · 2.2 MW · 6.6 km awayKinglet — Solar · VA · 5 MW · 6.7 km awaySpindle BESS — Storage · CO · 199 MW · 7.2 km awayHomestead Energy Storage LLC — Storage · CA · 14 MW · 7.3 km awayHadley Falls — Hydro · MA · 3.5 MW · 7.4 km awayBuena Vista Energy LLC — Storage · CA · 100 MW · 7.6 km awayStockton 9 - slcva209 — Solar · CA · 1 MW · 7.6 km awayPittsburg RV Solar — Solar · CA · 2.8 MW · 8.0 km awayStockton 1 - slcva801 — Solar · CA · 1 MW · 8.2 km awayFremont CA AutoFactory — Solar · CA · 3.8 MW · 8.8 km awayWaste Management Tri-Cities LFGTE — Biomass · CA · 4.8 MW · 9.1 km awayHolyoke MA BESS 1 — Storage · MA · 5 MW · 9.1 km awayCPV Pondera King Energy Center — Gas, combined cycle · TX · 900 MW · 9.4 km away
  • Storage
  • Bioenergy
  • Operating
  • Other infrastructure
  • Other companies nearby
  • 10 · 100 · 1,000 MW

Public agency

Key facts

Public agency · 188.1 MW
Assets
46
States
CA, CO, DE, GA, IL, IN and more
Registered in
United States
Parent
No parent recordedNo parent recordedLike 48,119 of 50,272 companies here. Why

Gross output of plants with a stake

8 of 8 plantsOutputGross: each plant's whole output, whatever the stake. Equity share: each plant's output times the stake.Covers 8 of 8 plants with a stake: US plants with an EIA monthly series.0% of the output is from 8 plants recorded as wholly owned.Not included: 1 plant it operates without a recorded stake.Ownership as recorded today; each plant's output is its whole series. A plant's group is its technology; Unspecified fuel is EIA's "All Other", hydrogen, CHP with no fuel stated and plants with no technology on record.

Gross output of plants with a stake MWh by month, 2024 to 2025
  • Storage
Yearly totals
Gross net generation of the plants with a stake, MWh by year and generation group, newest first.
YearStorageTotal (MWh)
2025-11,846-11,846
2024-5,896-5,896

Sources EIA-860 · EIA-860M · EIA

Sources

Attribution

Assets 46

Assets

46

2 kinds

Capacity

188 MW

35 of 46 give MW

MW by fuel
  1. Landfill gas to electricity: 88.9 MW, 26 assets
  2. Storage: 78.4 MW, 8 assets
  3. Biomass: 20.8 MW, 1 asset

Operates 1 power plant · Operates 37 RNG projects · Owns 8 power plants

Assets this company owns or operates, sorted by capacity, largest first.
Name. Sort by name, A to Z Type. Sort by type, A to Z Role. Sort by role, A to Z MW, sorted descending. Sort by capacity, smallest first State. Sort by state, A to Z Share Held by
Savannah River Site Biomass Cogen Biomass Operates 20.8 MW US-SC — Ameresco
Rattlesnake Ridge Battery Storage Storage Owns 11.8 MW US-CO 100.0% Ameresco
Davis Battery Storage Storage Owns 11.8 MW US-CO 100.0% Ameresco
Bromley Battery Storage Storage Owns 11.8 MW US-CO 100.0% Ameresco
Keenesburg Battery Storage Storage Owns 11.8 MW US-CO 100.0% Ameresco
Project #1 - Ox Mountain SLF RNG project Operates 11.4 MW US-CA — Ameresco
Project #1 - Chiquita Canyon SLF RNG project Operates 9.2 MW US-CA — Ameresco
Parkway Battery Storage Storage Owns 7.8 MW US-CO 100.0% Ameresco
Frederick Battery Storage Storage Owns 7.8 MW US-CO 100.0% Ameresco
Mead Battery Storage Storage Owns 7.8 MW US-CO 100.0% Ameresco
Platte Valley Battery Storage Storage Owns 7.8 MW US-CO 100.0% Ameresco
Project #1 & Expansion #1 - Chicopee Landfill (WMI) RNG project Operates 5.7 MW US-MA — Ameresco
Project #1 - Palmetto Landfill RNG project Operates 4.8 MW US-SC — Ameresco
Project #1, Expansion #1 & De-Expansion #1 - Al Turi LF RNG project Operates 4.4 MW US-NY — Ameresco
Project #1 - Foothill Sanitary Landfill, Inc. RNG project Operates 4.3 MW US-CA — Ameresco
Project #1 - Jones Crossroads Landfill RNG project Operates 4.2 MW US-DE — Ameresco
Project #1 - Forward Landfill RNG project Operates 4.2 MW US-CA — Ameresco
Project #1 - Al Turi LF RNG project Operates 4 MW US-NY — Ameresco
Project #1 - Keller Canyon LF RNG project Operates 3.8 MW US-CA — Ameresco
Project #1, De-Expansion #1 - Woodland Meadows Landfill RNG project Operates 3.5 MW US-MI — Ameresco
Project #1 - Jefferson City Sanitary Landfill RNG project Operates 3.2 MW US-MO — Ameresco
Project #2 - Buena Vista Drive SLF RNG project Operates 3.2 MW US-CA — Ameresco
Project #1 - Sandtown Landfill RNG project Operates 3.2 MW US-DE — Ameresco
Project #1 - Janesville City/Rock County Landfill RNG project Operates 3.1 MW US-WI — Ameresco
Project #1 - Neal Road Recycling and Waste Facility RNG project Operates 2.3 MW US-CA — Ameresco
Project #1, De-Expansion #2 - Al Turi LF RNG project Operates 2.2 MW US-NY — Ameresco
Project #1 - Stafford County LF RNG project Operates 2.1 MW US-VA — Ameresco
Project #1, Expansion #1 - Sandtown Landfill RNG project Operates 2 MW US-DE — Ameresco
Project #1, Re-Expansion #1 - Al Turi LF RNG project Operates 1.6 MW US-NY — Ameresco
Project #1 - Johnson Canyon SLF RNG project Operates 1.4 MW US-CA — Ameresco
Project #1 - Davis County Landfill RNG project Operates 1.3 MW US-UT — Ameresco
Project #1, Expansion #1 - Jones Crossroads Landfill RNG project Operates 1.1 MW US-DE — Ameresco
Project #1, Expansion #1 - Davis County Landfill RNG project Operates 1.1 MW US-UT — Ameresco
Project #1, De-Expansion #3 - Al Turi LF RNG project Operates 0.8 MW US-NY — Ameresco
Project #2 - All Purpose Landfill RNG project Operates 0.8 MW US-CA — Ameresco
Project #1 - Vasco Road SLF RNG project Operates — US-CA — Ameresco
Project #1, Expansion #1 - Pine Bluff Landfill RNG project Operates — US-GA — Ameresco
Project #1, De-Expansion #1 - Pine Bluff Landfill RNG project Operates — US-GA — Ameresco
Project #1 - Pine Bluff Landfill RNG project Operates — US-GA — Ameresco
Project #2 - Brickyard Disposal & Recycling Inc. RNG project Operates — US-IL — Ameresco
Project #2 - Laubscher Meadows LF RNG project Operates — US-IN — Ameresco
Project #1 - Benson Valley LF RNG project Operates — US-KY — Ameresco
Project #2 - Woodland Meadows Landfill RNG project Operates — US-MI — Ameresco
Project #1 - Woodland Meadows Landfill RNG project Operates — US-MI — Ameresco
Project #3 - McCarty Road LF RNG project Operates — US-TX — Ameresco
Project #2 - McCarty Road LF RNG project Operates — US-TX — Ameresco

Sources EIA-860M · GEM · EPA LMOP

Sources

Every source and license · Attribution

Around this company

Nearby 120

within 25 km

Projects

120

within 25 km

Nearest

0.1 km

Ameresco Butte County

All 120NearbyShowing all 120 nearby projects. The 50 nearest fill 49 rows, as a project's generator units share a row.

How these are matched

Exact-grade projects within 25 km of any asset this company owns or operates, nearest first, each with the asset it is closest to. Only projects with a site location are matched to assets; those placed only by county or state are not.

Projects within 25 km of this company’s assets, sorted by distance, nearest first: 49 rows for the nearest of 120.
Status Name. Sort by name, A to Z Type MW. Sort by capacity, largest first Distance, sorted ascending. Sort by distance, farthest first Nearest asset
Postponed Ameresco Butte County Biomass 0.2 MW 0.1 km away nearest: Project #1 - Neal Road Recycling and Waste Facility
Postponed TX Houston 7080 Express Lane Storage 1.5 MW 0.4 km away nearest: Project #3 - McCarty Road LF
Built JPMORGAN CHASE - PROJ SYCAMORE-BROOMFIEL Large load — 0.9 km away nearest: Parkway Battery Storage
Filed Ameresco Ox Mountain Biomass 3 MW 1.1 km away nearest: Project #1 - Ox Mountain SLF
Postponed Palmer Renewable Energy Biomass 42 MW 2.0 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Under construction 25156403 DATA CTR-STAFFORD TECH CAMPUS PH4 SOUTHCA Large load — 2.1 km away nearest: Project #1 - Stafford County LF
Filed Amazon Data Services Inc IAD-175 Stafford Technology Campus Large load — 2.1 km away nearest: Project #1 - Stafford County LF
Withdrawn Tres Vaqueros Wind Farms LLC Wind 28.3 MW 2.5 km away nearest: Project #1 - Vasco Road SLF
Under construction Greens Bayou 6 Gas, combustion turbine 445 MW 2.6 km away nearest: Project #3 - McCarty Road LF
Filed IAD350 Large load — 2.9 km away nearest: Project #1 - Stafford County LF
Filed Amazon Data Services Inc IAD-350 Large load — 3.0 km away nearest: Project #1 - Stafford County LF
Unknown EDGECORE DATA CENTER MECP1 SANTA CLARA 1 PROJECT Large load — 3.6 km away nearest: Project #2 - All Purpose Landfill
Filed Edgecore -3580 Large load — 3.7 km away nearest: Project #2 - All Purpose Landfill
Under construction Aramis I Solar Project × 2 units Storage 200 MW 3.8 km away nearest: Project #1 - Vasco Road SLF
Unknown SJC02 & SJC03 DATA CENTER Large load — 4.0 km away nearest: Project #2 - All Purpose Landfill
Postponed Stony Brook Gas, combined cycle 422 MW 4.2 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Filed Crusoe Brighton Buildout TI Large load — 4.3 km away nearest: Bromley Battery Storage
Unknown SV8 DATA CENTER Large load — 4.3 km away nearest: Project #2 - All Purpose Landfill
Filed Project Cannoli Data Center Large load — 4.3 km away nearest: Project #1, De-Expansion #1 - Woodland Meadows Landfill
Under construction Six Flags Magic Mountain Solar + storage 12 MW 4.3 km away nearest: Project #1 - Chiquita Canyon SLF
Filed Vantage Data Centers VA41 LLC Large load — 4.5 km away nearest: Project #1 - Stafford County LF
Unknown VANTAGE DATA CENTERS MANAGEMENT CO , LLC Large load — 4.7 km away nearest: Project #2 - All Purpose Landfill
Under construction Kifer BESS 1 Storage 50 MW 4.8 km away nearest: Project #2 - All Purpose Landfill
Postponed Front Range Project Biomass 1.6 MW 4.9 km away nearest: Parkway Battery Storage
Filed LBA Data Center West Large load — 5.0 km away nearest: Project #2 - All Purpose Landfill
Under construction VA 41 (Frederickburg data centre) Large load — 5.0 km away nearest: Project #1 - Stafford County LF
Built 4054 Digital Realty Large load — 5.2 km away nearest: Project #2 - All Purpose Landfill
Built PRIME DATA CENTERS Large load — 5.6 km away nearest: Project #2 - All Purpose Landfill
Filed 888 Ross Data Center Large load — 5.8 km away nearest: Project #2 - All Purpose Landfill
Under construction Keenesburg Solar 7.2 MW 5.8 km away nearest: Keenesburg Battery Storage
Filed 1200 Memorex Skybox Data Center Large load — 5.9 km away nearest: Project #2 - All Purpose Landfill
Postponed Riverside Holyoke Hydro 1.1 MW 6.0 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Under construction Chicopee BESS Storage 5 MW 6.2 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Built SKYBOX DATA CENTER Large load — 6.2 km away nearest: Project #2 - All Purpose Landfill
Under construction Fort St Vrain Gas, combustion turbine 478 MW 6.5 km away nearest: Mead Battery Storage
Filed Rooney Ranch Wind 21 MW 6.5 km away nearest: Project #1 - Vasco Road SLF
Postponed CA Moss Landing 3040 Hilltop Rd Solar + storage 2.2 MW 6.6 km away nearest: Project #2 - Buena Vista Drive SLF
Filed Kinglet Solar 5 MW 6.7 km away nearest: Project #1 - Stafford County LF
Under construction Spindle BESS Storage 199 MW 7.2 km away nearest: Frederick Battery Storage
Postponed Homestead Energy Storage LLC Storage 14 MW 7.3 km away nearest: Project #1 - Chiquita Canyon SLF
Postponed Hadley Falls Hydro 3.5 MW 7.4 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Postponed Buena Vista Energy LLC Storage 100 MW 7.6 km away nearest: Project #1 - Vasco Road SLF
Under construction Stockton 9 - slcva209 Solar 1 MW 7.6 km away nearest: Project #1 - Forward Landfill
Under construction Pittsburg RV Solar Solar 2.8 MW 8.0 km away nearest: Project #1 - Keller Canyon LF
Under construction Stockton 1 - slcva801 Solar 1 MW 8.2 km away nearest: Project #1 - Forward Landfill
Under construction Fremont CA AutoFactory Solar 3.8 MW 8.8 km away nearest: Project #2 - All Purpose Landfill
Postponed Waste Management Tri-Cities LFGTE Biomass 4.8 MW 9.1 km away nearest: Project #2 - All Purpose Landfill
Under construction Holyoke MA BESS 1 Storage 5 MW 9.1 km away nearest: Project #1 & Expansion #1 - Chicopee Landfill (WMI)
Postponed CPV Pondera King Energy Center Gas, combined cycle 900 MW 9.4 km away nearest: Project #3 - McCarty Road LF

Sources EIA-860M · EPA ICIS-Air · EPA ICIS-NPDES · Virginia DEQ · CAISO · ERCOT · FAA OE/AAA

Sources

Every source and license · Attribution