Show on map
SDCCD - Miramar — Power plant · Solar · CleanCapital HoldingsRancho Penasquitos — Under construction · Hydro · CA · 4.3 MW · 2.2 mi awayPomerado Energy Storage, LLC — Postponed · Storage · CA · 6 MW · 5.3 mi awayL3 Harris San Diego — Under construction · Solar · CA · 1.6 MW · 5.8 mi awayEnerSmart Mesa Heights Sub Station — Under construction · Storage · CA · 3 MW · 5.9 mi awayAlvarado Hydro Facility — Postponed · Hydro · CA · 1.4 MW · 9.8 mi awayEnerSmart Murray BESS — Postponed · Storage · CA · 21 MW · 9.9 mi awayEnerSmart El Cajon BESS — Postponed · Storage · CA · 3 MW · 13.4 mi awayEnterprise BESS — Permitted · Storage · CA · 54.1 MW · 14.9 mi away
  • Clean firm
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Operating
  • 10 · 100 · 1,000 MW

SDCCD - Miramar

Power plant · Solar

Key facts

Power plant · Solarran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2011
Net generation, 2025
1,317 MWh
Grid
12 kV to San Diego Gas & Electric Co (CISO)
Location
San Diego County, California

Output

Net generation MWh by year, 2013 to 2025

Operations detail

Details

Who’s behind it

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar source: “Solar Photovoltaic”
Age
15 years since 2011
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100000817687
Location id
L100000814873
Eia plant ids
59138
Grid
Nerc region
WECC
Report year
2025
Grid voltage kv
12
Transmission owner
San Diego Gas & Electric Co
Balancing authority code
CISO
Balancing authority name
California Independent System Operator
Fuel burned (MMBtu), 20254,493
Capacity factor, 20250.150
Net generation (MWh), 20251,317
Balancing authority codeCISO

Solar arrays

Array area (acres)
4.3
AC capacity (MW)
1
DC capacity (MW)
1.1
Mounting
Fixed tilt
Site type
Greenfield
Began operating
2011

Source USPVDB

Source

  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb

Attribution

Ownership

2 companies2
Companies with an ownership or operating interest in this asset.
CompanyRoleShareAs ofSource
CleanCapital Holdings Operator EIA-860M
GLC-(CA) SDCCD, LLC Owner 100.0% Dec 31, 2025 EIA-860

Timeline

  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · USPVDB · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory · EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • USPVDBOpen license · retrieved Oct 25, 2026Map services and data are available from Large-Scale Solar Photovoltaic Database, provided by the U.S. Geological Survey and Lawrence Berkeley National Laboratory via https://energy.usgs.gov/uspvdb
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory
  • EIA-860 Annual Electric Generator Report — Schedule 4 Owner (ownership shares per generator), plus Plant/Generator schedules

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Rancho Penasquitos Under construction Hydro 2.2 mi 4.3
Pomerado Energy Storage, LLC Postponed Storage 5.3 mi 6
L3 Harris San Diego Under construction Solar 5.8 mi 1.6
EnerSmart Mesa Heights Sub Station Under construction Storage 5.9 mi 3
Alvarado Hydro Facility Postponed Hydro 9.8 mi 1.4
EnerSmart Murray BESS Postponed Storage 9.9 mi 21
EnerSmart El Cajon BESS Postponed Storage 13.4 mi 3
Enterprise BESS Permitted Storage 14.9 mi 54.1

Sources EIA-860M

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026

Attribution