Show on map
Sediver — Power plant · Oil · Central Electric PowerSediver — Gas, combined cycle · SC · 520 MW · 0.0 km awayQTS-CLT1-DC2 Crane — Large load · SC · 10.9 km away
  • Combustion
  • Loads
  • In development
  • Operating
  • Size not stated
  • 10 · 100 · 1,000 MW

Power plant · Oil

Key facts

Power plant · Oilran 1% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2003
Net generation, 2025
129 MWh
Grid
12 kV to York Electric Coop Inc (DUK)
Location
York County, South Carolina
Operated by
Central Electric PowerSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2005 to 2025
Fuel burned MMBtu by year, 2005 to 2025
  • Oil

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Oil source: “Petroleum Liquids”
Age
23 years since 2003
Unused energy
25 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
9,488 Btu/kWh 2025
All 6 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
SERC
Report year
2025
Grid voltage kv
12.50
Transmission owner
York Electric Coop Inc
Balancing authority code
DUK
Balancing authority name
Duke Energy Carolinas
Fuel burned (MMBtu), 20251,224
Capacity factor, 20250.005
Heat rate (Btu/kWh), 20259,488.4
Net generation (MWh), 2025129
Balancing authority codeDUK

Timeline

  • In service · EIA-860M

Sources

3 sources

View at source

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Sediver Postponed Gas, combined cycle 0.0 km 520
QTS-CLT1-DC2 Crane Filed Large load 10.9 km