Sierra SunTower Solar Gen Station — Power plant · Solar thermal · Sierra SunTower LLCPortal Ridge Solar A, LLC — Postponed · Solar · CA · 19 MW · 7.1 mi awayPalmdale Water District HQ — Under construction · Solar · CA · 1.7 MW · 10.1 mi awayTierra Bonita Solar — Postponed · Solar · CA · 22 MW · 10.5 mi awayAntelope Solar Farm — Postponed · Solar · CA · 20 MW · 11.1 mi awayPalmdale Water District 6MG Tank — Under construction · Solar + storage · CA · 1.3 MW · 12.0 mi awayWillow Rock Energy Storage Center — Contracted · Storage · CA · 500 MW · 12.6 mi awayBig Creek Solar LLC — Under construction · Solar · AR · 400 MW · 13.6 mi away
  • Wind & solar
  • Storage
  • In development
  • Under construction
  • Retired
  • 10 · 100 · 1,000 MW

Sierra SunTower Solar Gen Station

Power plant · Solar thermal

Key facts

Power plant · Solar thermal Retired
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
2009
Net generation, 2014
0 MWh
Location
Los Angeles County, California
Operated by
Sierra SunTower LLCSourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2010 to 2014

Operations detail

Details

Who’s behind it

No companies named in filings yet.

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Solar thermal source: “Solar Thermal without Energy Storage”
Age
17 years since 2009
All 2 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Gem
Unit ids
G100001019629
Location id
L100001017642
Eia plant ids
57323
Balancing authority codeCISO

Retirement

EIA-860M September 2026StatusEvery generator EIA lists at this plant has retired. As of EIA-860M for September 2026.
Retired
December 2014
Capacity retired
7.5 MW
Generators retired
1
Generators that retired or are scheduled to retire
GeneratorTechnologyNameplateStateDate
UNIT1Solar Thermal without Energy Storage7.5 MWRetiredDecember 2014

Grid

EIA-860Grid fieldsAs the plant reported them to EIA-860 (Schedule 2).
Balancing authority
CISO
Transmission lines within 15 mi (8)
Connection points within 15 mi (1)
Can the connection be reused?

A plant that retires usually leaves its substation, transmission connection and interconnection agreement behind, and those may be reusable by a new project at the same site. FERC Order No. 845 lets an interconnection customer use surplus interconnection service at an existing site, and some transmission providers' tariffs let a replacement resource take over a retiring unit's interconnection service, usually within a set time after the retirement. Whether any such right still exists here, who holds it and on what terms depends on the owner, the transmission provider and timing; this page does not establish any of that.

Timeline

  • Stated Unit UNIT1 scheduled to retire, 7.5 MW · EIA-860M
  • In service · EIA-860M

Sources

6 sources

Sources EIA-860M · GEM · LBNL · CAISO · EIA · EIA-860M Preliminary Monthly Electric Generator Inventory

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • GEMOpen license, with credit · retrieved Oct 26, 2026Global Integrated Power Tracker, Global Energy Monitor, September 2026 release (https://globalenergymonitor.org/projects/global-integrated-power-tracker), CC BY 4.0. Modified by Inframation: TransitionZero-sourced rows removed; statuses and technologies mapped to Inframation's vocabulary; figures aggregated. Copyright © Global Energy Monitor. Global Integrated Power Tracker, September 2026 release. Distributed under a Creative Commons Attribution 4.0 International License.
  • LBNLOpen license, with credit · retrieved Nov 13, 2026Yin, Nait Belaid & Heleno (2026), Lawrence Berkeley National Laboratory, OEDI, CC BY 4.0: A Harmonized Geospatial Dataset of U.S. Transmission Lines: Linking FERC Form 1 and HIFLD, 1994-2024. Modified by Inframation: HIFLD-side fields only, names re-cased, coordinates rounded.
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)
  • EIA-860M Preliminary Monthly Electric Generator Inventory

Every source and license · Attribution

View at source

Around this plant

Nearby

within 15 mi
Projects within 15 mi, nearest first.
ProjectKindAwayMW
Portal Ridge Solar A, LLC Postponed Solar 7.1 mi 19
Palmdale Water District HQ Under construction Solar 10.1 mi 1.7
Tierra Bonita Solar Postponed Solar 10.5 mi 22
Antelope Solar Farm Postponed Solar 11.1 mi 20
Palmdale Water District 6MG Tank Under construction Solar + storage 12.0 mi 1.3
Willow Rock Energy Storage Center Contracted Storage 12.6 mi 500
Big Creek Solar LLC Under construction Solar 13.6 mi 400

Sources EIA-860M · CAISO

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • CAISOOpen license, with credit · retrieved Nov 16, 2026Source: California ISO