Show on map
Sim Gideon — Power plant · Gas, steam turbine · LOWER COLORADO RIVER AUTHORITYDogwood Creek Solar and BESS — Solar + storage · TX · 878.7 MW · 13.8 km away
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2025
826,681 MWh
Grid
138 kV to Lower Colorado River Authority (ERCO)
Location
Bastrop County, Texas
Operated by
Lower Colorado River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Output

Net generation MWh by year, 2001 to 2025
Fuel burned MMBtu by year, 2001 to 2025
  • Gas
  • Oil

Operations detail

Details

Who’s behind it

Owner
Lower Colorado River AuthoritySource100.0%, EPA Greenhouse Gas Reporting Program — facility register with parent-company shares (Envirofacts pub_dim_facility; FLIGHT), as of 31 Dec 2023

Interested in this project?

Set an alert Book a call Join the beta

Our team gets you what you need.

Beta: private project space · data room · readiness check

Technology
Gas, steam turbine source: “Natural Gas Steam Turbine”
Age
61 years since 1965
Unused energy
4,631 GWh 2025Unused energyA lead, not a guarantee: MW × hours × (1 − capacity factor) for the latest year (EIA-923), gas, coal and oil plants only. Air-permit run-hour caps, heat rate (cost to run) and capacity-market or reliability obligations can rule it out.
Heat rate
11,230 Btu/kWh 2025
All 7 attributes from EIA-860M Preliminary Monthly Electric Generator Inventory
Attributes
AttributeValue
Grid
Nerc region
TRE
Report year
2025
Grid voltage kv
138
Transmission owner
Lower Colorado River Authority
Balancing authority code
ERCO
Balancing authority name
Electric Reliability Council of Texas, Inc.
EPA greenhouse gas reporting (GHGRP)
EPA FRS ID
110035784112
Subparts reported
D
NAICS code
221112
Subpart PP (CO2 supply)
No
Subpart RR (geologic sequestration)
No
Subpart UU (CO2 injection)
No
Reporting year
2023
GHGRP facility ID
1000954
Fuel burned (MMBtu), 20259,284,017
Capacity factor, 20250.151
Heat rate (Btu/kWh), 202511,230.5
Net generation (MWh), 2025826,681
Balancing authority codeERCO

Timeline

  • In service · EIA-860M

Around this plant

Nearby

within 25 km
Projects within 25 km, nearest first.
ProjectKindAwayMW
Dogwood Creek Solar and BESS Postponed Solar + storage 13.8 km 878.7

Sources EIA-860M

Sources

Attribution