Show on map
Sim Gideon — Power plant · Gas, steam turbine · LOWER COLORADO RIVER AUTHORITY
  • Combustion
  • Operating
  • 10 · 100 · 1,000 MW

Power plant · Gas, steam turbine

Key facts

Power plant · Gas, steam turbineran 15% of 2025 Operating
Capacity
Capacity: sourceEIA-860M · Open licenseMW
Commissioned
1965
Net generation, 2025
826,681 MWh
Grid
138 kV to Lower Colorado River Authority (ERCO)
Location
Bastrop County, Texas
Operated by
Lower Colorado River AuthoritySourceEIA-860M Preliminary Monthly Electric Generator Inventory

Operations

Net generation, 2025
826,681MWh
Fuel burned, 2025
9,284,017MMBtu
Capacity factor, 2025
15.2%
Heat rate, 2025
11,230Btu/kWh
Capacity factor % of full output, by year
Heat rate Btu per kWh, by year
Net generation, fuel burned, capacity factor and heat rate by year, newest first, as EIA's bulk electricity file states them.
YearNet generation (MWh)Fuel burned (MMBtu)Capacity factorHeat rate (Btu/kWh)
2025826,6819,284,01715.2%11,230
20241,043,14811,789,83719.1%11,302
20231,195,71113,510,21421.9%11,299
2022851,4839,729,47015.6%11,426
2021662,0187,450,34612.1%11,254
2020647,1097,151,22411.8%11,051
2019742,8607,963,74713.6%10,720
2018550,1966,092,37710.1%11,073
2017326,1363,702,8576.0%11,354
2016402,1874,570,8387.3%11,365
2015278,0273,212,9245.1%11,556
2014143,1301,719,9972.6%12,017
2013268,1313,143,2354.9%11,723
2012306,0693,596,4395.6%11,750
2011553,5516,679,33710.1%12,066
2010879,04510,175,77116.1%11,576
2009958,25511,651,77717.6%12,159
20081,055,64212,162,22619.3%11,521
20071,001,79311,685,02018.4%11,664
2006763,2998,865,11714.0%11,614
2005803,4429,411,50814.7%11,714
2004968,03210,209,91317.7%10,547
20031,207,46712,457,25022.1%10,317
20021,309,56214,007,33324.0%10,696
20011,475,70415,440,78927.0%10,463
How these are worked out

Net generation and fuel burned are the monthly figures EIA publishes in its bulk electricity file, from the plant's Form 923 reports; a year is the sum of its months. Capacity factor is a full year's net generation over today's nameplate capacity times the hours in that year (8,784 in a leap year), so a plant uprated or partly retired since reads against its current size; heat rate is fuel burned over net generation, for plants that burn fuel. A year with fewer than twelve months stated has no capacity factor, and a value outside the plausible range is left blank rather than shown. By month, the charts apply the same rules to each month's own hours and fuel.

Sources

2 sources

Sources EIA-860M · EIA

Sources

  • EIA-860MOpen license · retrieved Nov 4, 2026
  • EIAOpen license · retrieved Nov 1, 2026Source: U.S. Energy Information Administration, Electricity bulk data (Form EIA-923 monthly plant series)

Every source and license · Attribution

View at source